Laserfiche WebLink
<br /> <br />-3- <br />Other <br />1) The applicant should be reminded not to use topsoil from the <br />sediment pond site to construct the embankment for the pond. <br />2) TYie technical revision indicates that runoff from a portion of the <br />disturbed area is routed to an existing mine pit. This is acceptable as <br />a temporary sediment control method. However, when the mine pit is <br />backfilled, another means of controlling sediment will be required. <br />If you or the applicant have any questions concerniny the review let me <br />know. <br />/ys <br />cc: Jim Pendleton <br />Ed Bischoff <br />Bob Liddle <br />Doc. No. 0009 <br />