Laserfiche WebLink
<br />=~ <br /> <br /> <br />Mr. Steve Manger -~- November 9, 1981 <br />7. Anew design drawing which shows the entire depth of cut necessary <br />for flitch E and a narrative describing the disposition of excavated material <br />was submitted. <br />I0. A revised Figure C-2 has been submitted which clearly shows the <br />location of We11 7, as well as all other ground water monitoring sites. <br />19. A drawing of topsoil markers and a statement in di ca tiny the intent <br />to display them at all topsoil stockpiles war; submitted. <br />22. A drawing of the blasting warning sign and a description of safety <br />precautions taken at the site was submitted7. <br />23. A copy of a Ietter rd hich was sent to A1bT Oil, Inc. informing it of <br />the right to a preblasting survey was sabrniCted. <br />26. A design drawing and narrative description of measures to be taken at <br />culvert inlets to reduce the ten den cu for clogging was submitted. <br />27. A copy of alI reclamation Fee payment receipts was submitted for proof <br />of their payment. <br />Wyoming Fuel Company has also committed to implement all appropriate measures <br />to satisfy the remaining stipulations (except the 'new' ones) within the time <br />frames specified in the stipulations. <br />Please let me know if you necrl a copy of ,lddendum V, or if you need anything <br />else from this Division. We also would like to knor.~ what action, if any, you <br />wi21 take. Zf deletion of any of the above-listed stipulations will accelerate <br />the decision process, pleaso clo so. <br />Thank you. <br />Sincerely, <br />Richard Domingue <br />>~ <br />Reclamation Specialist <br />RD f mt <br />cc: Wyoming Fuel Companrr <br />