Laserfiche WebLink
going by what local farmers and ranchers have <br />stated. <br />21. We will move this discussion. We are not going <br /> to have to seed any cropland. <br />22. lJe will update the application to reflect seeding <br /> followed by mulching. <br />23. With the retention of the reclamation pond we will <br /> not be seeding any cropland. <br />24. The banks of the sediment pond are the top soil <br /> that was removed when the pond was built. We will <br /> reflect this on map #11. <br />25. We will modify the application to reflect that we <br /> will only mark the affected surface area. <br />26. We will revise the discussion on Page4.02-2 to <br /> reflect that we will mark our topsoil stockpile. <br />27. 1'h is has been addressed in re ply to question 16 <br /> of this reply. <br />28. The only water users that we know of are Tony Sarver <br /> and Dan ~C Lawrence Iluntington and the Ilay Gulch Ditch <br /> Association. <br />29. The topsoil stockpile will he seeded this fall. <br />30. We will expand on Page 4.07 t o state that a cap will <br /> be welded onto the casing if it is not in use at the <br /> time. <br />31. We will omit the discussion o n Page 4.29. <br />-4- <br />