Laserfiche WebLink
.,From: YyIlllam P. l7elaz To: OaVe Reny - Dale: p/$Ip5 Tme: 12:3p:3B Pape 1 of 1 <br />KLH Engineering Group <br />O,C. M2 Mine <br />Reclamation Plan Development <br />Project Budget <br />,. os/o2rss <br />ised: 09104/95 <br />This spread sheet develops a budget to develop a regrading and <br />hydrologic reclamation plan for the O. C. #2 Mine near Gunnison, <br />Colorado. The basis for the task tlescription is the Division of <br />Minerals and Geology's Request for Statement of Qualifications <br />dated August 26,1995. The assumptions used to develop the <br />bud et are described below. <br />Bud et Assum tions <br />our arcs: <br />William P. Bala2 Jr, P. E. $60.00 <br />Kurt R. She herd, PLS $40.00 <br />Cadd $30.00 <br />Soils $45.00 <br />Secrets $20.00 <br />Ex cocas: <br />Per Diem meals onl $25.00 er arson <br />Miles a rate $0.38 er mile <br />Out of Pocket - et cos[. <br />as o. as escn tlon ersonne amours ost <br />1 Ver and/or Develo Current <br /> To o ra hlc Ma <br /> Fleld Surve Inclutles travel & PB 14 $840.00 <br /> collection of soil sam les and rm it review. KRS 14 $560.00 <br /> EdR Surve Data and Develo Cadd 8 5240.00 <br /> Current To o ra hic Ma <br />Subtotal Labor Teak 1 36 51,640.00 <br /> Miles a 306 miles $116.28 <br /> Per Diem 2 rsons $50.00 <br />Subtotal Task 1 Ex enses 3168.28 <br />Total Tesk 1 f1,806.28 <br />2 Develo Post-Minin To o m h Ma PB ? $1?0.00 <br /> Cadd 2 $60.00 <br />Subtotal Tesk 2 Labor 4 5780.00 <br />3 Develo H tlrolo is Reclamation Plan PB 5 $300.00 <br />Dralna a Area Ma antl Desi n Drawln s Catld 5 $150.00 <br />Subtotal Task 3 Labor 10 5450.00 <br />4 Develo Cross Sections PB 2 $120.00 <br /> Cadtl 5 $150.00 <br />Subtotal Task 4 Labor 7 3270.00 <br />5 Stabil~ Anal sis Soils 72 $540.00 <br /> Anal sis of Soll Sam les Lab $500.00 <br /> PB 4 $240.00 <br />Subtotal Tesk 5 Labor 16 51,280.00 <br />6 Pre ration of Technical Revision Packs a PB 2 $120.00 <br /> Secrets 4 $80.00 <br />Subtotal Tesk 6 Labor 6 5200.00 <br />TR A lication Co in O erator DNislon-3, <br />Courthouse, OSM, KLH, B8A $50.00 <br />Total Task 6 5250.00 <br />7 FollpWU PB 8 $480.00 <br />Total Project Labor 87 56,500.00 <br />Total Project Ex enses f216.28 <br />Contin enc - $% 5235.61 <br />Total Project SO 952.09 <br />