Laserfiche WebLink
:From: Wllllem P. 9alaz To: Dave 9errY Oe1e: 6/5185 Tlme: 12:42:33 <br />Balaz & Associates, Inc. <br />KLH Engineering Group <br />O.C. #2 Mine <br />Reclamation Plan Development <br />Date: 09/02/95 <br />Revised: 09/04/95 <br />Pro'ect Schedule <br />Tesk Descri tion Start Dete Duration <br />Site visit, survey, and soil sample 09/11/95 1 Day <br />Soil sample testing 09/12/95 1 Week <br />Edit survey data to develop as built <br />opographic map 09/12/95 1 week <br />Develop hydrologic plan 09/18/95 1 Week <br />Slope stability Analysis 09/18/95 1 Week <br />Develop post mining topographic ma 09/25/95 2 Days <br />Develop cross sections and volumes 09/27/95 1 Day <br />ssemble Technical Revision package 09/27/95 2 Days <br />Submit Technical Revision package to <br />operator 09/30/95 <br />Follow u As Re wired 10/02/95 2 Weeks <br />Pepe 1 d 1 <br />