Laserfiche WebLink
D. A. Bem - 6 - December 4, 1996 <br />25. DMG -This issue requires additional resolution. A separate review letter (dated <br />November I8, 1996), regardi»g geotechnical concerns was sent to B12L by Fax on <br />November 20, 1996. <br />BRL - No response at this time. This issue will be discussed at a meeting with the DMG <br />on December S". <br />26. DMG -Please reference No 28 below. <br />27. DMG -Resolution of this issue is pending further response. Refer to No. 25 above. <br />28. DMG -Please forward the referenced Colorado Department of Transportation Highway <br />Access permit as soon as it becomes a~ilable. <br />BRL -The Colorado Department of Transportation Highway Access permit is enclosed. <br />It should be inserted into Volume III, Exhibit 13, Other permits. <br />29. - 53. No response required. <br />54. DMG -Please provide the revised Pond A designs as soon as they are available, or <br />address the question posed in our August 9, 1996 letter. <br />BRL -Dugout Pond "A" will not be constructed on the site. Morrison Knudsen <br />Corporation has redesigned ponds "B" and "C" to handle the run-off and sediment <br />previously proposed to be treated by Dugout Pond "A". <br />55. - 67. No response required. <br />68. DMG -additional information is needed This issue is pending adequate resolution of <br />the geotechnical concerns most recently addressed in our November 18, 19961etter to <br />BRL. <br />BRL - No response at this time. This issue will be discussed at a meeting with the DMG <br />on December Sm. <br />69. & 70. No response required. <br />4.1.4 Runoff Control Ditches <br />No response required. <br />