My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10395
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:47 PM
Creation date
11/19/2007 2:10:14 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Application Correspondence
Doc Date
12/5/1996
Doc Name
BOWIE 2 MINE NEW APPLICATION C-96-083
From
JE STOVER & ASSOCIATES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. A. Hem - 2 - December 4, 1996 <br />DMG -Well Permits It is noes our understanding that State Engineer's Offrce (SEO) <br />wet/permits will not be required for wells installed so%ly for the purpose of monitoring <br />water quality and quantity. Please be aware that SEO well permits are typically <br />required if water from the underground workings, or airy other groundwater is used by <br />the mine operator for arty beneficial use. <br />BRL - No response requrred. See 17a. <br />DMG -Department of Army 404 permits -Provide the permits when obtained. <br />BRL - At this time it appears an individual permit will be required from the Corps. The <br />individual permit will provide for the disturbance of a small acreage of wetlands as well as <br />"bed and bank" disturbance. According to the Corps, (Randy Snyder 243-1199), <br />individual permit acquisition takes approximately 90 days. <br />8. No response required. <br />8a. DMG -Please submit the completed reports, and a letter from SHPO which verifies the <br />resolution of issues contained in the July 18, 199ti teller. <br />BRL -Enclosed is the level II documentation of structures within the I-Tistoric Town of <br />Bowie and the Associated King Mrne. The original cultural resource inventory and the <br />level II documentation are to be included in a new permit Volume VI. Enclosed are three <br />espies of new permit Volume VI. Please remove the original Cultwal Resource Inventory <br />Reports dated November 30, 1996, from Volume III, Exhibit 2 and place them in the new <br />Volume VI. We have asked the SHPO if the level II documentation is adequate. No <br />response from the SHPO has been received as of this date. Also enclosed is revised page <br />2.04-9 which explains the level II documentation of structures. <br />9. No response required. <br />10. DMG -This issue has been referred to Jim Pendleton fog review. <br />11. - 12. No response required. <br />13. Paragraph 1 and paragraph 2: No response required. <br />Paragraph 3: <br />DMG -This response is generally accepted Does BRL have more recent water level <br />data for the referenced DH-48 well? Has the water level remained at or be%w the level <br />of the fault? <br />
The URL can be used to link to this page
Your browser does not support the video tag.