My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
APPCOR10368
DRMS
>
Back File Migration
>
Application Correspondence
>
1000
>
APPCOR10368
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 6:26:46 PM
Creation date
11/19/2007 2:10:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980002
IBM Index Class Name
Application Correspondence
Doc Date
5/11/1995
Doc Name
RECLAMATION PLAN O C 2 COAL MINE PN C-80-002
From
DMG
To
O C 2 COAL MINE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..~ <br />iii iii~iiiiiiiu iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmenr of Natural Rex x~n v~ <br />1313 Sherman St., Room 2 i ; <br />Denver, Cobrario 80203 <br />Phone: 13031 866-3 567 <br />FA%: f3031 832-8106 <br />May 11 1995 <br />I~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br /> <br />Mr. Robert weaver Roy Romer <br />eoveroor <br />0.~.'. #2 COal Mlne dames S. lochhead <br />2054 County Road 730 E+ecuiive Dkeaor <br />Gunnison CO 81230 Michael g. long <br /> Dwisron Duxior <br />RE: Reclamation Plan; O,C. d`2 Coal Mine; Permit No. C-80-002 <br />Dear Mr. Weaver; <br />As I have been reviewing the permit for the O.C. ,~2 Coal Mine I <br />have noted that the reclamation plan is not very clear. I have <br />identified a number of areas where the plan is lacking and I would <br />like to get these issues worked out so that you are clear on what <br />work is required when you begin the reclamation this summer and the <br />Division is clear on what the reclamation will entail for the mine <br />so that the bond can be released more quickly. Therefore a minor <br />revision application should be submitted which addresses the <br />following questions and requests. <br />1. We had discussed at an earlier date the seed mix for the mine. <br />If it is still your intention to revise the seed mix please do <br />so at this time. <br />2. As Jac}.1yn mulch is no longer available please revise the <br />permit to identify which type of mulch will be utilized and <br />how it will be applied. <br />3. Does the landowner intend to graze the reclamation? <br />4. The bac}:filling and grading plan needs to identify the fact <br />that coally material will be handled separately from the good <br />clean backfill. The Division's recommendation is to segregate <br />the coally material backfill this material compact the <br />material and then backfill benches with the clean backfill. <br />This plan would also include the reclamation of the refuse <br />pile. <br />The backfilled area should be graded to approximate pre-mining <br />slopes to provide adequate drainage and which meets a minimum <br />static safety factor of 1.3. A stability analysis of the <br />backfill should be provided to show that it will meet the <br />minimum static safety factor. <br />
The URL can be used to link to this page
Your browser does not support the video tag.