Laserfiche WebLink
.~ <br />~y. <br /> <br />? under our exploration program. Both the roads and well sites <br />will be reclaimed under .these bonds once the water monitoring <br />wells are no longer needed. Therefore, these roads are <br />included in a bond estimate already and should not be required <br />to have double bond posted under the Yoast estimate. <br />14. Ripping and topsoil redistribution costs for road reclamation <br />already exist in the estimate. Table 25-2-5, Haul Road <br />Reclamation, contains miscellaneous road information used <br />later on in the estimate. Worksheets PR-1, PR-2, and HR-1 in <br />Attachment 25-4 are the ripping portions of the estimate for <br />the permanent and reclaimed haul roads. In Table 25-2-6, <br />Topsoil Balance, the haul road topsoil redistribution will <br />come from Stockpile C. The cost for haul road topsoil <br />redistribution is calculated on Page 25-6-21 and totals <br />$63,621. Costs have also been determined for the reclaiming <br />of light use and access roads on Pages 25-4-20 and 25-4-21, <br />respectively. <br />15. Worksheet No. WA-3 in Attachment 25-3 was updated to contain <br />the same blasting cost data which was submitted for the Seneca <br />II Mine midterm review estimate. These updated costs were <br />actually used in the appropriate calculations on Worksheet No. <br />WA-4. An error was detected in the total amount of explosives <br />used for highwall reduction. The correct number of 133 rows <br />• was inserted into this calculation, and the explosives costs <br />revised. <br />16. A cost to dredge Ponds l0 and 11 over the ten-year liability <br />period has been included in the estimate. <br />17. Costs for structural demolition have been updated to reflect <br />those in the 1995 MEANS edition. <br />18. A cost to remove the sludge from three diesel tanks and <br />possible contaminated soil around the tanks has been included <br />yin the estimate. <br />19. Indirect costs for Public Liability insurance and Contractor's <br />Performance Bond have been incorporated into the bond <br />calculations. <br /> <br /> <br />27 <br />