Laserfiche WebLink
<br />784.21 <br />(a)(1) No statement is provided as to how enhancement of fish <br />and wildlife resources will be achieved. <br />(2) If enhancement is not praticable a statement should be <br />provided as to why it is not praticable. <br />(b)(2) If an active golden eagle nest is likely to be impacted <br />by the proposed activity, then impact control measures <br />should be identified to protect the nesting activity. <br />(3) If the permit area is within critical elk and mule deer <br />range, then impact control measures should be employed <br />to limit related impacts. <br />784.22 <br />See 784.14. Ditches, berms, culverts, dikes, etc. <br />should be designed pursuant to 817.43 - 817.44. <br />784.23 <br />(a) Clarify the differences in both surface and subsurface <br />plans between the Preliminary Mine Layout Map, the Map <br />of General Improvements, and Exhibit D, the I4ining Plan <br />Map. <br />(b)(2) See 78L.17(a) <br />(3) Show each area of land for which a bond will be posted <br />under Subchapter J <br />(5) See 784.19 <br />(6) See 784.14 (b)(1) <br />(8) See 783.21 (b) <br />(lU) See 784.25 <br />(11) Provide additional cross-sectional profiles of antici- <br />pated final surfaces as required by the regulatory auth- <br />ority. <br />(12) Show locations of water and subsidence monitoring points. <br />See 734.14 (b)(3). <br />(13) Identify and locate any facilities which will remain <br />as permanent features. <br />(c) Provide evidence of preparation by a qualified registered <br />engineer or professional geologist (notarization). <br />11 <br /> <br />