Laserfiche WebLink
• Coal Loadout <br />\_ d. LCC will pmyide a rectangular pond design for the coal Loadout in a future <br />~1;9~'"~ submittal. The revised run will incorporate the change in contributing wa[ershed <br />w'". since the water west of the rail spur will oo to detention sumps. <br />e. A table with the ditch and culvert summaries will be provided at a later date. <br />~,d~" y~ The emergency spillway crest eleva[ion on Map Ex. 1~-14 was chan_sed to refiec[ <br />~'" [he currently submitted plan at the Loadout. <br />Fill 2 <br />g. The Fill '_ pond will be re-evaluated in a future submittal. <br />~„~- ~ Fill 3 <br />h. and I. The Fill 3 pond will be re-evaluated in a future submital. <br />Fill <br />j. and k. The Fill ~ pond wilt be re-evaluated in a future submittal. <br />• Fill 8 <br />6 ~ Design information for Fill 8 had not been revised and was not originally included <br />in the revised Exhibit 1~. Fill 8 pond documentation should be added to the <br />revised Exhibit 1~. <br />1,-`„ !'S0. This information ~~ ill be submitted. At this time, this response is inadequate. <br />~'r~` ~7 Res~nse <br />This information will be provided following permit subminal. <br />_ ^ _~ ~J 1. This information «ill bz submitted. ?,t this time, this response is inadequate. <br />(~ "1~ Response <br />5 ti This geotechnical information kill be provided after the permit a issued. <br />(~~`~~' The Exhibit td table of contents. pace i. should identify figure EX ld-1 gib. no[ E\ I:-gib. <br />Response <br />• Page I of E.yhibi[ l ~ table of contents has been revised to correct the t~ po~_raphical error. <br />zs <br />