Laserfiche WebLink
MINE SITE EVALUATION INSPECTION REPORT <br />Energy No. 3 i•line <br />VI. ADMINISTRATIOf7 INFORMATION <br />6 1. Hours travel to and from site <br />1,860 2. Acreage of permit (approx. 200 acres disturbed) <br />5 hrs 3. Inspection time (on site) <br />1 hr 4. Permit review time <br />1 hr 5. Report-writing time <br />PAGE 5 <br />Date <br />IRA DUTTON <br />nt Name of Authors <br />resentative <br />~~i ~/ ~ ~'71~5 <br />viewed By Date <br />