Laserfiche WebLink
<br />areas are so minor that it did not make a difference in the <br />curve numbers. <br />b. The roads at Yoast are not paved and therefore, the assigned <br />ranges remain as stated. <br />c. Per Tab 9, Addendum 5, the Hydrologic Group Classification for <br />Topsoil Salvage areas would change only if the water intake <br />rate is different. The only soil series that would change <br />would be Routt (2D, 2E) and Buckskin (12C, 12D). These two <br />types would have a D hydrologic grouping after the topsoil <br />had been salvaged. The spoil, graded spoil, and pit areas <br />overall have moderate rates of water intake because of high <br />rock content and numerous continuous fractures. Of course, <br />the Lennox overburden would have slower intake rates than the <br />sandier Wadge overburden, but the averaged rate would still be <br />a moderate rating. <br />26. <br />v/ ° 2 9 <br />30. <br />'=~V~vn 31. <br />~~ <br />~/ <br />In the interest of resolving the question of May through <br />October versus the annual average precipitation, SCC has <br />agreed to use the precipitation values suggested by the <br />Division for this exercise. <br />Seneca Coal Company (SCC) has included language on Page 11, <br />Tab 13 indicating the remaining three sedimentation pond <br />design reports (012 to 014) will be submitted to the Division <br />for review and approval prior to construction. <br />Pages 13-17 and 13-7-1 have been revised and coincide with the <br />information shown on Exhibit 13-9. The road ditch side slopes <br />will be 3:1 on one side and 2:1 on the other. SCC was unable <br />to find on Page 13-7 where we committed to 5:1 slopes. If <br />this page was referenced erroneously by CDMG, SCC will revise <br />this statement where it does appear to stay consistent with <br />the other information. <br />SCC has proposed to retain a portion of haul roads A and B as <br />a permanent access road. SCC will provide the Division with <br />the necessary landowner consent forms for the proposed <br />postmine land use by March 15, 1995. It should be noted that <br />the retention of the access road is consistent with language <br />in lease agreements already signed by SCC and the respective <br />landowners. The description of the postmine road is detailed <br />in Items a to g under the retention heading on Page 22. <br />Landowner consent and comments will be included in Appendix <br />22-2, Tab 22 of the PAP. <br />32. SCC will submit to the Division either a copy of the permit <br />obtained or a written waiver thereof from the Colorado <br />Department of Health or Routt County for installation of a <br />septic system prior to construction. The text on Page 32, Tab <br />13 has been revised to include this statement. <br />33. Tab 13, Table 13-2 and Tab 13, Attachment 13-1, Table 2, Pages <br />13-1-6 and 13-1-7, were updated to include soils mapped in the <br />7 <br />