Laserfiche WebLink
<br /> <br />Pond #4 Area Disturbed: 1.2 acres <br />Embankment Volume: 2000 BCY <br />2000 BCY x $.11/BCY = $220 <br />1.2 acres x 81501/acre = 1801 <br />TOTAL Pond #4 $2021 <br />Temporary Impoundment #1 <br />Area Disturbed: 1.7 acres <br />Embankment Volume: 4083 BCY <br />4083 BCY x $.11/BCY = $499 <br />1.7 acres x $1501/acre = 2552 <br />TOTAL TEMPORARY IMP. #1 $3001 <br />In summary, total estimated pond reclamation costs <br />are as follows: <br />Pond #1 $3573 <br />Pond #2 853 <br />Pond #3 349 <br />Pond #9 2021 <br />Temp. Imp. #1 3001 <br /> TOTAL $9796 <br />At any one time, no more than about 5000 ft of <br />diversion ditch (outside disturbed area) will be <br />in use. At an average width of 6 ft, this will <br />occupy less than one acre that can be reclaimed <br />by normal grading, seeding and mulching with no <br />topsoiling required. An allotment of $1000 should <br />be sufficient for this process. <br />Three-wire barbed wire fences can be installed for <br />less than $1.00 per foot. WFC estimates that less <br />than 2000 ft of fence will have to be replaced, <br />which should easily be accomplished with an allot- <br />ment of $2000. <br />The total estimated reclamation cost for roads, ponds, <br />diversion ditches and fences is summarized below: <br />Roads $1801 <br />Ponds 9796 <br />Ditches 1000 <br />Fences 2000 <br />TOTAL $19,597, say $15,000 <br />ESTIMATED COST/BCY FOR DOZERS <br />Dozer Type: Caterpillar D-9 Straight Blade <br />Availability: 908 <br />Utilization: 908 <br />Moderate grades with good traction <br />-4- <br />