Laserfiche WebLink
i' <br /> <br />In regard to vegetative cover sampling techniques, <br />there are 10 points per transect with each transect <br />representing one sample. Hits on vegetation, bare- <br />ground, rock or litter are recorded at Sm intervals <br />along a SOm transect. In determining percent cover <br />for a vegetative community total hits by species for <br />lifeform are divided by the grand total number of <br />hits which results in relative cover estimates. <br />A list of plant species by community are represented <br />in Tables 6F and 7F of Appendix F of the April 14, <br />1981 application. <br />2.05 <br />Minimum Requirements for Operation and Reclamation Plans <br />2.05.2 Operation Plan - Estimated Area for Life of Operation <br />2.05.2(2} Figure 1 of this Addendum is provided as a rough <br />approximation of possible future mining beyond this <br />permit application. <br />2.05.3 Operation Plan - Permit Area <br />2.05.3(3)(b)(i)(C) The crusher was constructed in the spring <br />of 1979. <br />2.05.3(3)( ) As stated in the April 14, 1981 permit applicatio , <br />each pit will have in-pit haul roads. The in-pit <br />haul roads are considered temporary because as <br />mining progresses the roads are relocated and min d <br />out. The in-pit roads will have 10-15~ overall <br />grades and pitch grades of 15~ or less. <br />The BLM right-of-way coal haul road has an overall/~~ <br />grade of 1$ and the steepest pitch grade is 108 <br />for 300 feet. The remainder of the required <br />information was stated in the April 14, 1981 permit <br />application. <br /> <br />The haul roads from Pit 1 and Pit <br />structed according to the typical <br />illustrated by Figure 3 of the Ap <br />application. The haul road from <br />overall grade of~s1.5~ and a pitch <br />along 160 feet of road. <br />2 will be con- <br />cross section <br />ril 14, 1981 <br />Pit 2 has an <br />grade of 13~ <br />Figure 2 of this addendum illustrates profiles of <br />the BLM right-of-way haul road and the Pit 1-Pit 2 <br />haul. road. <br />The remainder of the information required under <br />this paragraph is covered by referring to Figures <br />2 and 3 and the original April 14, 1981 application, <br />Pages 31-35. <br />-~- <br />