<br />ao <br />nniTH KIRK, MIKE MCCARTHY <br />DECEEIBER 26, 1979 <br />PAGE -5- <br />18) Refer to page 780-106. The mining & reclamation sequence leaves out <br />redistribution of topsoil. I'm sure this is just an oversight and <br />is only brought to your attention as that. <br />19) Refer to page 780-111. The topsoil salvage plan for Energy Mine /E1 <br />does not agree with baseline soil information. This information should <br />be used in the topsoil salvage plan. <br />20) Refer to 780-112, The extent of the old spoils to be used to backfill <br />part of the final 8050 pit is not accurately portrayed. A clear discussion <br />of the use of the old spoil is required. <br />21) Refer to 780-113. The variance request for the underground mine does not <br />meet the requirements of the regulations. Further discussion of this <br />,,. <br />point is needed. -. ~,,.,~;~„ S ~ ;:!'~ c4~' <br />22) Refer to 780-115. Amore thorough discussion of subsoil salvage and <br />the areas where this salvage will occur should be indicated on~ap. <br />23) Refer to 780-115. The applicant should indicate the rate of which mulch <br />will be applied to the topsoil and subsoil stockpiles. Also, what conditions <br />will warrant the construction of ditches around the stockplled soils? <br />24) Refer to 780-116. The applicant should indicate to what depth subsoil will <br />be replaced. A table could be used to demonstrate this. <br />25) Refer to 780-116. The applicant should indicate to cahat depth topsoil will <br />be replaced. A table could be used to demonstrate this. Show' depth <br />of soil replaced and amount of°ieceiving topsoil for each year. <br />26) The 1979 204 and 770 areas in the NWti of Section 17, T4N,1~86W will not <br />be backfilled until 1981. Please clarify how this complies with the <br />contemporaneous reclamation requirements. Also, it appears that the <br />area will have subsoil redistributed before the area is graded - Please <br />clarify. <br />27) What haul road will service the 3/1/80 204 box cut and 8050 pit? <br />28) It is not clear how spoil will be transported from the 1986 8050 pit to <br />the western part of the mine site. <br />Z9) What roads will be utilized to walk the draglines from the various pits? <br />Generally, the application should clearly identify how spoil will be handled, <br />i.e. how all the final cuts {both dragline and shovel) will be filled and <br />the source of this material. The haul road network to service all the pits <br />should be clearly indicated. The overburden volume calculations for each of <br />the pits should be submitted-include overburden volume, coal volume and <br />volume of pit to-_ be filled, The applicant should review the mine plan maps, <br />(cont'd) <br />