Laserfiche WebLink
<br />Page 9 <br />H-G Preliminary Adequacy Review <br />2.05.5 Post-14ining Land Uses <br />At this time, it is unclear whether the establishment of permanent stock <br />watering ponds is consistent with the post-mining land use. Additionally, <br />~ establishment of these ponds as permanent stock ponds has a direct effect <br />on downstream water rights. This proposal will, therefore, require a <br />decision by the State Engineer's Office. The applicant must demonstrate <br />with a narrative, drawings, and any other available information that these <br />structures are in compliance with 4.05.9. <br />2.05,5(1 b Please forward comments from local and state government agencies that <br />approve or authorize the proposed post-mining land use. <br />2.05.5(1)(c) Exhibit "D" is not a map of detailed management plan for range or grazing. <br />This should indicate how and when the plan will be implemented, and what <br />areas will be +iffected and when during the course of the mining operation. <br />2.05.6 Mitigation o.f >urface Coal Mining Operation Impacts <br />2.05.6(1)(b) Dg/the powerlines supplying power to the air quality sampler conform with <br />'.05.6(3)(6)~The applicant does not specify that S-3 will be monitored. Is this omission <br />(iii)`simply an oversight? <br />~ he wildlife plan and the Department of 4ildlife requirements? <br />?.05.6(1)(c) lease indicate' the location of the two air samplers at the coal loadout <br />cility on Exhibit L. <br />?.05.6(2 /Please detail your plan to protect and enhance wildlife during utilization <br />of the permit and adjacent areas. <br />?.05.6(2) /A response may be necessary if plant species not yet fully identified <br />(iii)(a)/ turn out to be threatened or endangered species. ~ ~~ <br />x.05.6(2) Please explain impact control measures, management techniques, and monitoring~~ <br />(iii)(c)~~methods to protect or enhance the wet meadows community. <br />.05.6(3)(b) l,: In what manner was the 3 acre foot per year net reduction in surface <br />-water yield computed? <br />2. Please submit a proposal for monitoring springs and seeps during and <br />rafter the mining operation. <br />