Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd Sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (K): <br />L. DRILL ROLE/MONITORING YELL SEALING <br />Task No.~ Task Description ~ Cost (f) <br />__......I__________________________~.__...._______________I_____.______ <br />1 ~ Seel 8 plug 34 drillholes ~ (152, 288 <br />Subtotal (L ): 5152,288 <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description ~ Cost (f) <br />________I__________________________________________________I____________ <br />Demolition <br />2 ~ feeding ~ f9, 480 <br />Fencing <br />6 ~ Mob/Demob ~ E261 <br />Subtotal (M): f9, 741 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): (206,372 <br />II. INDIRECT COPTS <br />________________________________________________________________________ <br />____________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFtT <br />Item No.~ Item Description ~ Cost (S) <br />________I__________________________________________________I____________ <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ 53,199 <br />2. ~ Contractor's Performance Bond 0.975% of dir. ~ 52,012 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ f20, 637 <br />4. ~ Job Superintendent.. ~ f0 <br />________________________________________________________________________ <br />Subtotal (A): f25,848 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 5232,220 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (f) <br />________I__________________________________________________I____________ <br />1. ~ Contract Prep., Eng. Fees..... 4.25% of cnt r.l (9,869 <br />2. ~ Staff Admin. Expenses......... 0.75% of cn[r.~ f1, 742 <br />NET INDIRECT COST PERCENTAGE: 18.15% Subtotal (B): (11,611 <br />TOTAL INDIRECT RECLAMATION LOSTS (subtotals A through B): f37,459 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect tos[s): 5243,831 <br />