Laserfiche WebLink
RECLANATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />Subtotal (H): <br />1. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Tesk No.~ Task Description ~ Cost (S) <br />Subtotal (I ): <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost (f) <br />5 ~ Topsoil Distribution on pads, pits, and road ~ 521,394 <br />Subtotal (J): f21,394 <br />