Laserfiche WebLink
' S7A71StlC8."""'" <br />DEPELOPP~NT. <br />Total number oP feet in ahafta, <br />„ •, ., drifts, <br />+. „ development <br />~sr E~zoYE~. <br />8 diners at $3 per day of 8 hours, <br />1 Trammer 3 g <br />.. <br />1 Engineer 4 g <br />,. <br />1 Supt. <br />200 Coat per ft. $25.00 <br />450 ,, 10.00 <br />650 <br />C 0 S T S. <br />I <br />~ ~7ood, $4 per cord, Average cost per month, $40.00 <br />Timber, 12 cte. per in. 20.00 <br />i ., „ „ <br />Powder, 14 lb. 70.00 <br />„ ,. „ ., <br />Cost transporting ore, <br />75 cts. per ton to LIill, $1.50 per ton <br />i to Black Hawk. <br />9 <br /> <br />a~ <br />