|
<br />STATISTICS.
<br />Average tomlag•a per month, 300.
<br />Total feet in shaf't's, 050, Cost per ibot 15.00.
<br />Total fe6t in dr:ii'ts or levels, f385. -0ost par .fout, ?0.00.
<br />Total i.'eet in cross cute, 7.80, Cost per rout iP£3.00.
<br />Tutal feet in davalopmerlt, 2015,
<br />P4en ample;/od
<br />6 machine tirillmell, ~. ?;4.00 for8 hoar shift.
<br />' ?. tirnbarraen> 3.50 " fi "
<br />?, helpers, 3.00 " F3
<br />4 trammers, 3.00 " 8
<br />?, ane•ineers, 4,00 " 4 " "
<br />1 blacksmith, 4.00 " A "
<br />1 helper, 3.50 " fi
<br />7. i'oreman, ~ 4.,50 " 8 " "
<br />1, Supt. part olvnar in leusa.
<br />1 oi'1'ice hale, ,'75.00 par month, '
<br />Averafgealtxmbar• of rnen atnployed 1'or the ~•ear•, 27.. 1G nndere;rround
<br />i}nd-six on suri'ace,
<br />Cost of fuel, ~~5.00 par ton. Avar•nl^a cost par• mwlth, ~~300.00.
<br />Cost of timber,, ?p22,00 to X25.00 per• 1R. Averag;e co:;*, per rnontil, ?100,
<br />Cost o1' steal, 9f! par :LL••.
<br />Cost oi' oi3, h0 to fi5;~ per +~;ai. Averap;a cost per month, f,?60.00.
<br />incluc4inE; candlas.
<br />Cust oi' puwdar ,13.•15 per cwt. Aver•at;a cu:+t par month, X269.00.
<br />Avar•a~~;a r.srlny value or•a par tun, ~~20.00.
<br />Ccst par toil, miltillf; oi' or•e, ypfi.00
<br />Cost per ton, treatment of era, 5.75.
<br />Cost per tun, trarreporcinl; ors, 5011 b,+ wt~~;ou.
<br />
<br />
|