Laserfiche WebLink
<br />STATISTICS. <br />Average tomlag•a per month, 300. <br />Total feet in shaf't's, 050, Cost per ibot 15.00. <br />Total fe6t in dr:ii'ts or levels, f385. -0ost par .fout, ?0.00. <br />Total i.'eet in cross cute, 7.80, Cost per rout iP£3.00. <br />Tutal feet in davalopmerlt, 2015, <br />P4en ample;/od <br />6 machine tirillmell, ~. ?;4.00 for8 hoar shift. <br />' ?. tirnbarraen> 3.50 " fi " <br />?, helpers, 3.00 " F3 <br />4 trammers, 3.00 " 8 <br />?, ane•ineers, 4,00 " 4 " " <br />1 blacksmith, 4.00 " A " <br />1 helper, 3.50 " fi <br />7. i'oreman, ~ 4.,50 " 8 " " <br />1, Supt. part olvnar in leusa. <br />1 oi'1'ice hale, ,'75.00 par month, ' <br />Averafgealtxmbar• of rnen atnployed 1'or the ~•ear•, 27.. 1G nndere;rround <br />i}nd-six on suri'ace, <br />Cost of fuel, ~~5.00 par ton. Avar•nl^a cost par• mwlth, ~~300.00. <br />Cost of timber,, ?p22,00 to X25.00 per• 1R. Averag;e co:;*, per rnontil, ?100, <br />Cost o1' steal, 9f! par :LL••. <br />Cost oi' oi3, h0 to fi5;~ per +~;ai. Averap;a cost per month, f,?60.00. <br />incluc4inE; candlas. <br />Cust oi' puwdar ,13.•15 per cwt. Aver•at;a cu:+t par month, X269.00. <br />Avar•a~~;a r.srlny value or•a par tun, ~~20.00. <br />Ccst par toil, miltillf; oi' or•e, ypfi.00 <br />Cost per ton, treatment of era, 5.75. <br />Cost per tun, trarreporcinl; ors, 5011 b,+ wt~~;ou. <br /> <br />