My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01050
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 2:19:59 PM
Creation date
11/18/2007 12:25:53 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
8
Document
Inspectr
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />^ <br /> <br />MINING AND MINE METHODS. <br /> <br /> <br />The nat>sre and extent of main opening. <br />The Mabel M. shaft. is 4x9 Ft. is the clear <br />and •is timbered from! surface down 113 Feet with 3x8. Inch <br />sawed crfbbimg, the next ~ Ft. is timbered wQth <br />stalls and the balance of the dis:4ance= to the bottom <br />whiich is 467 feet., is tiarberecF with slqua~re seta . <br />Thera are four levels, the 6th being connected with <br />the Gold'Dollar.~shaftand the: 4th level ie connected <br />with .The Gold Dollar tunn9l The ore shoat on~the <br />lower level which is the eighth is k50 Ft. long and has <br />an average w,idith of three ft. This is known as the <br />water level and is 649 Ft. from the surface. <br />Work is being carried on at the present time Dn the <br />6th• grid 7th and 8th levels. and ie in the sameveins <br />untiersseath the old workings. The method employedi for <br />r ~1 <br /> <br />• J <br />„ <br />t. 1 ~ <br /> <br />hai'ating is by means of buckets. The vreight of the load <br />3soiated is 2'100• and the distance hof~ted is 6491 Ft. The <br />kind of cable used Ts one inch eruci;ble steel! fn fair <br />condntion and hae been~in use for a year: .Safety chain <br />and clamps a,re used on' the end of the cable. This was <br />changed' do April 20th,,. 1906, TFiere are nrm amfety devic~eu <br />to prevent overwinding. The material is hoiatad from two. levels <br />The nature• of"~the.:$aiel 1£ne and.. the.etgnalbe3].aECfis.:a b~8 3rscli, <br />&empr~ rope attached to a 10 tench gong. The olaE mine <br />code is employed. The code of signals is posted in: the <br />engine room, at,the collar of the shaft and at each lewel <br />station. All persons sre prohtLited from .ri'di'ng om <br />loaded bucket. The ard'e r is not posted at the collar <br />of the shaft. There 1a nb notlcQ posted' at ,the collar oP <br />the abaft and a,t e>a¢hlle>zdl atatiag the maximum nunobe3r . <br />of men permitted to ride on the bucket. The shaft at <br />-y <br />
The URL can be used to link to this page
Your browser does not support the video tag.