Laserfiche WebLink
Y ~ ~ <br />METALLURGICAL PLANT. ~~ <br />The average number of men employed for the year, <br />i= <br />~~ ~~ 100-- 63 under-ground and 37 on the surface. <br />Coat of fuel--------4.75 to ~p5.50 per ton-----coat per Md.3200. <br />Cost of timber------------X24.00 per ~, per Mo. 6000. <br />Cost of steel----------8 1~2 ¢ per ~i45;, ~< <br />~l~ ,~. 100. <br />' Coat oP oil--------- 48 ~ Per .Gal.--- Per Mo 100. <br />Coat of powder----------X11.70 Per Cwt. <br />per ~JGo. 1500. <br />The average value of ore per ton----,----about $E40.00 <br />i <br />Coat per ton for the mi~.G?1ng of ore ---- -- 19.00 (all exp. <br />enses) <br />Coat per ton for treatment of the ore------- 9.00 <br />Vj~ <br />I <br />l ' ~ <br />\ Y~ <br />r' :; <br />,., ~. <br />~ .' ~4 <br />~.T <br />' ".i <br />• ..;.j^ <br />r <br />