Laserfiche WebLink
I, <br />10 <br />'. j? <br />ti` F i <br />~. 1 ~, i <br /> <br />F '. <br />.a <br />GENERAL REMARKS. <br />The average tonnage per Mo. is 1600 tons. <br />The total No. of feet in drifts or levels is 72,369,80 <br />The total No, of feet in shafts is 2750------Cost per Ft,~25,00 <br />20------machine drillmen------4,00------for------8 hrs. shift. <br /> 2 ----machine helpers------ 3.50 -----"-------" " " <br /> 2 ___-------Watchmen------__- 3.00 ----" -----" n n <br />5 __---timberman-------------- 3.50---" ---__„n " " <br />1 7 -------trammera------------ 3.00 ----"----------" n <br />4 topmen----------- -----------3.00--_--"---------" n <br />2 ----------cagera-------------5,50-----"---------" n <br />1 -------assayer---------------4.00-----"---------" " <br />4 engineers--------------------4.00-----"-------- " " <br />3-----Fumpmen------------^-----4.00-----u' ----- <br />3 firemen--------------------3.50------"------ <br />2 blacksmith-------------------4.00------"------ <br />2 helpers----------------------3 <br />50-----"--_---- <br /> . <br />2 foremen----------------------4 <br />50-°--"------- <br /> . <br />1 Superintendent---------------400,00-----for on <br />1 office assistant----------------125.00 per Mo. <br />2 Carpenters-------------------4.00 ----"------- <br />6 pipemen----------------------3.00 ----" ------ <br />one Master Mechanic----------_-5.00 ----"_-_____. <br /> <br />