My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK01047
DRMS
>
Day Forward
>
Mine Books
>
MINEBK01047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2009 2:17:45 PM
Creation date
11/18/2007 12:25:35 PM
Metadata
Fields
Template:
Mine Books
County
Teller
Volume
10
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:'" <br />DEUE:.OPPAEPT T . <br />-- Total RIo. ft. in shaft, 2,500, Av. cost per ft. $20.00 <br />" " " drifts <br />or levels 5,000, " " B.00 <br />" " in winzes <br />and raises, 250, " " " 12..00 <br />" " '"f in development, 7,750 <br /> <br /> ZA}30I? . <br /> 12 machine drillmen, 4.00 for 8 hour s hift. <br /> 4 timbermen 3.50 " g " " <br /> 12 trammers, 3.00 ,' 8 " „ <br /> 5 ore assorters, .3.00 8 " <br /> 2 topmen, 3.00. ,, 8 ,, „ <br /> 2 engineers, 4.Ob „ 8 " „ <br /> 2 blacksmiths, 4.00 " 8 „ „ <br /> 1 foreman, 4.50 " 8 „ " <br /> l superintendent, 10.00 8 " ~' <br /> 2 firemen, 3.50 " 8 " „ <br /> Average number o f men employed for the year, 43-- <br /> 29 underground-and 14 on surface. <br /> COST. <br /> Cost of coal, X5.00 per ton, Av. cost per month X550. <br /> <br />Cost of timber., 20.00 <br />" M. " " , <br />_" " . <br />250 <br /> <br />Cost of ponder, 12.00 <br />cwt, " <br />", " . <br />1 <br />000 <br /> Avera~~ assay value ore per ton,20.00 , <br /> Gost per ton. ruining of ore, X15.00 <br /> Cost per ton treatment of ore, gp5.50 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.