Laserfiche WebLink
;t <br /> <br /> <br /> ,hand,.and-they a,re in good eon.dition. <br /> Chiztas' are loaded by gravitation. <br /> Underground tramming is done by cars loaded by <br /> hand. from chutes,using. standard guage 'mine ;cars, <br />- 8 lb . ",T" rails and 18" guage . <br /> The-mine. is ventilated b Bonn c ' <br />y e tion on 800 with <br /> the Ajax Trine and on 300 with the Dead Pine% mine, and <br />~" is suff'ici'ent at this time. Tio noxious gases ar© met <br />~ with. <br />t <br />~~ :I' All old timbers have .been removed. from undergrmzn <br />~~~ workings, <br />`;: <br />k The. shaft is d.iwided into two eompartmsnts and is <br /> provided with ladder-way which is safe, secure and <br /> ,accessible. The ladder-way contains air pipes, and <br /> .landings-are provided- in ladder-way nab to exceAd,20 <br />' feet apart. There .are ,no winzes or r,an-ways connect- <br />f ~~ <br />ing levels. <br /> The mine has more than one exit. for employ©s,. <br /> from; 800 through the Aja$ and from 300,through the <br /> Dead Pine,, and is readily accessible to employes, <br />. , <br /> <br /> <br />~ <br />~: ~ <br />rI <br /> <br /> - <br /> <br />I - <br />t, <br />~; <br /> <br />., <br />r <br />Fa. If <br /> <br />L ~ - .. <br />R-„o _ _ <br /> <br /> <br /> '~ ~ - x `.> >e. - r .. <br />