My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00914
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 10:25:53 AM
Creation date
11/18/2007 12:21:42 PM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
10
Document
Inspectr
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;d I N I N G (Continuedl. <br />en slide ®aties. Onderground tramming by manual labor with steel <br />bucket and truck. Trackage 18 in. puage 9 lb rails. <br />Vent illation natural and sufficient.:voxious gases are not met <br />with. Sanitary conditions are good. <br />The shaft is divided into two rompartments,buaketvray and maauay. <br />'!'he marraay is provided with ladders the ladders are safe,secure <br />and accesaiblo. Laddeiway contains steam and water pipes. Land- <br />ings are provided in laddenvay not to exceed 20 ft apart. <br />There are winzes and mamxays connecting levels. <br />At least one sianv+ay is kopt in repair and equipped vrith laddora. <br />The mine is connected vrith Big your shaft. exit is readily acces- <br />sible to employees. <br />Lighting underground by candlos. <br />S T A T I S T I C S. <br />Production <br />Average tonnage per mont}i <br />pevelopmont, <br />Total Wombat tt in shaft <br />Total number ft in drifts or levels <br />Total number ft in cross-cute <br />Total number ft in vrinzes and raison <br />Total number ft in developmont,•sork <br />~n employod~ <br />8 ;,iiners <br />3 Trammors <br />1 Fngipoer <br />1 Foreman <br />Coet, <br />at $3,00 Pot 8-hour nhift <br />u <br />n $3.00 <br />n <br />u $~,OU <br />n <br />u $4.50 <br />Cost of Puel per ton <br />Average cost fuel Per month <br />pvorage cost timber per month <br />200 tens <br />300 ft <br />600 ft <br />100 ft <br />loo rt <br />1100 ft <br />$5.50 <br />$ 75.00 <br />$50.00 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.