My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00914
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00914
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2009 10:25:53 AM
Creation date
11/18/2007 12:21:42 PM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
10
Document
Inspectr
Suffix
B
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.s <br />', i <br />i <br />i <br />~, i <br />i.' <br />i': <br />>. <br />~ y <br />~.l { <br />,o <br />~' <br />,I) <br />I f <br />ii <br />~f. <br />~; li <br />ii <br />i !~ <br />;, <br />~~I i! <br />~~~, <br />'I <br />I` <br />1I t <br />!I ,I a <br />i:' ~ . <br />1 <br />'' <br />II .r <br />Id I N I N G (Continued). <br />Iden are rained end levered with hoisting mac}iinery. height <br />of load hoisted 1200 lbs. <br />Distance hoisted 170 ft. <br />The cable is steel wire 7~Btha and in goo3 condition. <br />Has been in use one year. <br />Chain hook is used on end o~ cable, The same being in <br />use four months. <br />There are .-,o safety devices used to prevent over-winding. <br />Material. is hoisted from ane level. <br />The bell line ie of 1,2 in. hemp rope and in good condi- <br />iion. <br />The state code of signals is employed they are posted in <br />the en<vine room,at collar of shaft and at each level sta- <br />tion. All persona are prohibited from riding on loaded <br />bucket; this order is not posted near collar of shaft. <br />Notice stating the maximum number of men permitted to ride <br />upon bucket at one time is ndt.poated near collar of shaft <br />and at each level station, • <br />There is but one opening at all level stations. <br />The shaft ie at all stations provided with guard rails. <br />Tlie shaft is secured by pillar of ground upon each ride <br />sufficient to insure safety,. <br />All winzes or mill holes are covered or surrounded with <br />guard rails. The shaft is not being sunk. <br />.Shaft house over collar of shaft, Power house 150 ft n.e. <br />of shaft house. <br />The method of ore extraction ie that of drifting and ovor- <br />hand stoping with single-hand drills. <br />The timbering method ie thatb of drift sets and etulle. <br />Timbering sufficient. <br />The timbers used are white spruce prepared at mill and in <br />i <br />good condition. <br />The loading chutes employed are of 6-in. lagging with wood- <br />. ~ .. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.