_T--
<br />STgTISTICS.
<br />loved into the
<br />DPVEZOPP,'L1PT?
<br />vith drift
<br />,
<br />Total No,ft. in tunnel,
<br />3400
<br />~
<br />ft'
<br />Cost
<br />ft
<br />
<br />•. from
<br />25 t
<br />o ~'
<br />p28,8O ,
<br />'feeted by
<br />P, motor,
<br />• P. motor- IiCN EP,IPbOYED.
<br />through 2 machine drill men, ~j3,50 per day 8 ho urs.
<br /> 1 helper, 3,50
<br />8
<br /> ., ,. „
<br /> 4 miners,' 3,00
<br />8
<br /> ., „ .,
<br /> 2 timberman, 3.00
<br />8
<br /> „
<br />
<br />being pro- 3 mockers, 3,00
<br />,+
<br />8 ,.
<br />
<br />~sible to 1 motorman 3,25
<br />++
<br />.+
<br />g ,.
<br /> 1 helper 2 75
<br />g
<br /> „ ,> .,
<br />
<br />sndlea 2 blacksmiths
<br />3.25
<br />g
<br />. „ „
<br /> 2 helpers 2 45
<br />9
<br /> ,> „
<br />ntly put 1 office man 3,00 g
<br /> „
<br />of the veins 1 foreman 5 OO g
<br /> „ ,
<br />ind single
<br />it timbering.
<br /> COSTS,
<br /> Timber, 7-1~2 cts, per in. for 10 ft, Av, per mo. ~1OQ,
<br /> Steel, 7-1~2 cts. per lb. 50
<br />
<br />.,
<br />.+
<br />,. .
<br /> Oil, 27 ets. per gal. Z0
<br /> „ ,
<br /> Powder, 12-1~2 ets. per lb. 600,
<br /> Transporting ore to mill, per ton,lO¢ „
<br /> Cost per ton treatment of are, .f~1,50
<br />WNN~
<br />
<br />
|