Laserfiche WebLink
_T-- <br />STgTISTICS. <br />loved into the <br />DPVEZOPP,'L1PT? <br />vith drift <br />, <br />Total No,ft. in tunnel, <br />3400 <br />~ <br />ft' <br />Cost <br />ft <br /> <br />•. from <br />25 t <br />o ~' <br />p28,8O , <br />'feeted by <br />P, motor, <br />• P. motor- IiCN EP,IPbOYED. <br />through 2 machine drill men, ~j3,50 per day 8 ho urs. <br /> 1 helper, 3,50 <br />8 <br /> ., ,. „ <br /> 4 miners,' 3,00 <br />8 <br /> ., „ ., <br /> 2 timberman, 3.00 <br />8 <br /> „ <br /> <br />being pro- 3 mockers, 3,00 <br />,+ <br />8 ,. <br /> <br />~sible to 1 motorman 3,25 <br />++ <br />.+ <br />g ,. <br /> 1 helper 2 75 <br />g <br /> „ ,> ., <br /> <br />sndlea 2 blacksmiths <br />3.25 <br />g <br />. „ „ <br /> 2 helpers 2 45 <br />9 <br /> ,> „ <br />ntly put 1 office man 3,00 g <br /> „ <br />of the veins 1 foreman 5 OO g <br /> „ , <br />ind single <br />it timbering. <br /> COSTS, <br /> Timber, 7-1~2 cts, per in. for 10 ft, Av, per mo. ~1OQ, <br /> Steel, 7-1~2 cts. per lb. 50 <br /> <br />., <br />.+ <br />,. . <br /> Oil, 27 ets. per gal. Z0 <br /> „ , <br /> Powder, 12-1~2 ets. per lb. 600, <br /> Transporting ore to mill, per ton,lO¢ „ <br /> Cost per ton treatment of are, .f~1,50 <br />WNN~ <br /> <br />