Laserfiche WebLink
2dorning Star -6. <br />biIIIIIIG_& MIIIE METHODS-Contin. <br />oP signals is posted in the engine room, at the collar oY the <br />shaft and at each level station. Persona are prohibited Yrom <br />riding on loaded sklpa but the order is not posted. All such <br />supplies have been left with_the management with orders to poet <br />'them 'in their proper places. <br />' The method of loading skips is by dumping the Dare into <br />'chutes and thenoo into the skips. The skid way is 16~ T rails. <br />' All level stations are provided with passage-way around <br />'the working shaft and also with guard rails. The shaft is se- <br />cured upon each side with pillars oY ground sufficient to secure <br />safety and all mill holes are protected ~+ith guard rails. The <br />abaft Se not being sunk. <br />The method oY ore oztraotion is by means o3 overhand <br />etoping and drifting. Leynor and Sullivan mnohine drills are <br />used and some single hand drilling ie done. <br />The method oY timbering is stalls covered with lagging. <br />The timbers arc prepared by hand Yrom pine and spruce, are in <br />good condition and euffioient to'oeoure saYoty. <br />Underground tramming is dodo by hand with steel oars. <br />The trackage is 18" euage and 8~'T rails. <br />The average amount of orator dealt with ie 26 gallons <br />por minute. The system employed for handling water Se two, <br />Do. 6, Cameron steam pampa. Tho 2iorizontal pu~ap is stationed <br />at the 300-ft. level and the einlter in bottom or the ehatt. <br />Capacity of the pumps is 32.000 gallons Dusty 24 hours. <br />The ventilation is natural 'and euffioient. Slo noziono <br />gnaca are mot with. The eanitary'oonditions are good and all <br />old tiabera have been removed frdn the underground workings. <br />Candles era used for lighting underground. <br />8 T A T I 8 T I C 8. <br /> <br />Grose produotioa of ore, not given. <br />everaea tonnage por month. 900. <br />,~ <br />{~ <br />`. <br />~. <br />~~ <br />~f <br />t `i <br />-i <br />~? <br />r: <br />Ii <br />~' <br />i <br /> <br />svarago essay valve ore per ton. ~0. <br />