My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00789
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00789
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 12:54:04 PM
Creation date
11/18/2007 12:17:47 PM
Metadata
Fields
Template:
Mine Books
County
Gilpin
Volume
16
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ ~ 1. <br />i;,a <br />,~ <br />' '. <br />,~ <br />t~ <br />~; <br />i <br />i; <br />~. ~' <br />h <br />'~ <br />I ,.,i :I , <br />,~ <br />~ I <br />~, <br />jk~l <br />~~I <br />r: <br />Druid - 5. <br /> <br />MZB.IIT.G & L~II2IE METHODS-Contin. <br />500-it. level: east, 90'} weet, 150'. ,._ <br />- Conaiderablq stoping has been done in.a7.1 eP the above <br />desorib~d drifts.and .considerable ere of a good grade has been <br />taken out. <br />Active work consists of atoping and drifting in the 150- <br />it. 200-Pt.. and 300-it ...levele_on both aides of the shaft. <br />The main shaft is stuil: en the. Druid vein. Oa this cams . <br />vein is a vertical shaft 25b' in depth and situate 700' aa8t <br />oP the main ~haFt. On the Searl vein is a shaft 180' in depth. <br />The shaft on the Kokomo vein is 600' in depth and the shaft on <br />the Hazeltine vein is of aonsiderable depth but the exact num- <br />ber of teat-could ,hot be learned. d~,l of these shafts are idle <br />sad could not be examined at this time. <br />An additional exit is Furnished through a shaft situate <br />,- <br />:i <br />~> <br />i~, ~i <br />a <br />~' i <br />i <br />290' east of the. main shaft The 150-Pt. level of the working <br />shaft is connected with the exit shr.-0t and is properly equipped <br />with safe, secure and accessible ladders and the abaft is kept: <br />in good, condition. <br />The method employed For hoisting is steam and the men <br />,are raised and lowered vtith the hoiatint, mhahinery. A lead <br />weighing 1,000 g is heisted et one time e'distanae sf 300' <br />with a Pive-oighthe inch steel wire cable that has been in use. <br />two wseka. A safety hook and chain, used-two weeks, is employed <br />-and is fastened on end of cable with clamps. Haterial is hoiat+ <br />sd Frem three l~vols. _ <br />The state sods of eigna3s and .pull bolls are employed.'• <br />The bell 11ne,i8 three-eighths inoh,Manilla rope in good.con- <br />dition. The sods oP signals is. .posted in the engine room, at _, <br />the collar eF the shaft and at .each level station, Pereens are <br />prohibited _*roa riding on:l~aded'buokpta end this order is <br />posted near the collar of the shaft. The masianm-.nuaber of men <br />permitted to ride in the buoket:at one time:is-iive and this <br />order is posted at the collar-o~'the ehait and at each level <br />
The URL can be used to link to this page
Your browser does not support the video tag.