Laserfiche WebLink
<br />Druid - 4. <br />. .~ - .SURFACE PLANT-Contin._ <br />1.000' north of the .angina room. The ,plant for preparing timbers <br />is out on the dump. The head Exams is 2-post, 8" x 8" pine tim- <br />bare and 24' high. The sheave wheel is three feet in diameter, ~~ <br />oast iron sad tilled with rope. <br />- The Dollar of the shaft is of sufficient height. to prevent <br />material from idling in the shaft and is Zrovided vtith• gable <br />doors. The height is eutfiaient to prevent persons frog tripping <br />rnd telling in the shaft. <~~• <br />17o protection agAinst fire has been provided. <br />E X P L O S Z V E 5. <br />DuPont powder.- 40p ;,German Inseloidifuse; 6-X Daps and <br />wooden tamping bars are .emplo;~ed. Explosives in excess of one <br />day's supply axe not stored undergrotu-d. <br />The average amount -0f explosives kept in storage is 200. <br />This is stored in a.freme, iron-covered magazine situate. 80' <br />Yorth of the engine house and is used for the storage. et powder <br />only. All other supplies are stored in the engine house. <br />1Qo device for thawing. powder has been provided as the kind <br />of powder used does not harden except 1n extremely cold weather. , <br />MI$IIIG & i~I17E METHODS . <br />The ma~.n shaft is 517', in depth and cribbed its entire <br />depth with round timbers. The shaft is divided into two compart- <br />ments for a ladder-way and bucket-way and oaoh compartment le <br />4' x 4' in the clear. The ladder-way ie equipped with eats. es- <br />aure and aooessibls ladders. does not contain air, steam or water <br />pipes pnd ha,s.landings 16' apwrt. <br />Lerele have been driven in the main shaft as follows: • <br />100-Yt. level: east, 600'; west, 2b0'. <br />200-tt._lerel:. " 32b'; " 17b'. <br />•'300-ft.~level: " 32b'; n 200'. <br />400-it. level: " 27b'; " _____ <br /> <br />