Laserfiche WebLink
r <br />~~ ~ ; <br />The average net receipts per ton oP ore <br />ton; the cost of mining was $3.3; per ton, a. <br />penditures on the North Moyer Shaft, Tucst <br />ton, leaving a profit for the mine of 8n. zq Ix <br />' the valugof the ore produced. <br />The following amount of prospecting aqd <br />' done on the Mover property. <br />9inkiogr North Moyer Shaft ............ ..: <br />Drifting ............. .................... .. <br />Winzes and Rnieea .... ............ ..... ..... <br />Diamond drillingr 4 holes ..................: <br />Totnt ................ .............. .... ..... <br />The Denver and Rio Gravde Railroad has <br />sidetracks to the North Moyer ore house; the <br />have been extended to the ore bodies; avd the <br />first class condition, ready to output and handL <br />' the ore the purchasers will receive. This s: <br />ore fiom the North part of the mine, enabliv; <br />the output, and also to further develop the <br />property. <br />TUCSON 9HABT <br />Work .vas started in August to repair the <br />has been installed at the shaft t yo-H. P. boilt <br />evgine and a water muk, all of which were ren <br />the old buildings have also been repaired am <br />bin built. <br />The development work done at the Tucson <br />' Uri(tina, now work ........................ . <br />llrifting, ropnire old work ... ................ <br />Wlnaea and ridnoe.... _ .... ...... ...... ...... <br />Diamond drilling, a holos........~.~.......... <br />Total...~.~....~ .......................~..... <br />The development work so far makes a ver <br />but I woald advise further exploration work u <br />before going to the expense of a new shaft and <br />