ON SILVER MINING COMPANY, ~ -
<br />Orxr, I'eGruary 8, 190/.
<br />3lininy Comravty;
<br />is of rho Rinnnainl Agont and tha
<br />oor 31, 1909.
<br />;IAL AO);NT.
<br />.........B Ii28,789.98
<br />.......... 3,066 93
<br />... ..... 92,027.08
<br />.... .... 2,071.03
<br />-- B 671,966.39
<br />~o. $ 31$,027 32
<br />......... II,962.90
<br />..... .... 69E,16
<br />... ...... 7,807.84
<br />.... .... 4,02711 $ 993V407.32
<br />.. $ 037,468.12
<br />.... .. $ 97 299.82
<br />.. .. . ... 19,8 LL 20
<br />..... .. ,, 2,308.40 ~$ 09,993 22
<br />-_-_ --
<br />......... $ 272,984.90
<br />,..... ... 119,669.33
<br />6 392,961.79
<br />..... ... 200,000.00
<br />---
<br />......... ~ 8 182,661.73
<br />ore and linhilities nn tnksu [, mn rho
<br />...... BIO,OOO,Of10.W
<br />...... 192,riU3.T9
<br />LS.
<br />..... 810,000,000.00
<br />..... I02,RU4.79
<br />610102,504,49 $10,192,601.73
<br />i' ~f
<br />'-
<br />r. ~ .~~
<br />3
<br />REPORT OF THE MANAGER
<br />Herewith I submit the following statement of the operations on
<br />your property for the year ryo3.
<br />The surface improvemevts of necessity and tending to greater'
<br />economy of production are:,
<br />rst, At the Moyer, a new dwelling ]rouse and additions to the
<br />old ore house and machine shop, costing $q,6eo.oa.
<br />znd. At the North Moyer shaff, a new ore house of the follow•
<br />fog dimensions, 82 feet long, z6 Eeet wide and S6 feet high, with a
<br />storage capacity of Soo tons, and connected with the shaft house by a
<br />trestle; also a vew boiler house, stable, two water tanks hoisting
<br />engive, with capacity of raising 60o tons per day moo feet, ~ water.
<br />heater and [80o feeYOf piping. Lt addition [n the above Ntere was
<br />removed from the Stevens Shaft and installed at theNorth Moyer,
<br />3 too-H. P. boilers, r air campresser and z air receivers, the cost of
<br />these improvements was $32',$00 00.
<br />3rd. The, Ditch and water line have now been entirely rebuilt
<br />and repaired with new boxes aad wrought irov pipe, for n distanee of
<br />[3,gzo feet, or z.g2 miles, at a gross cost of $6,yzq,oo; ro,g6o feet bE
<br />the water line was new boxivg laid in the main. ditch, avd the bal-
<br />ance z,66o feet of iron pipe from and of the ditch to different parts of
<br />the property. The ditch and water lice will not require further ex-
<br />penditure for repairs or renewals for many years.
<br />The total expenditures for all surface improvements, new build-
<br />ivgs, machinery, ditch repairs, etc., nmo»nted to $45~979~no•
<br />The shipments of crude ore frotu the Moyer have reached a total
<br />of [oo,z [8.999 loos, divided as follows: ,
<br />Iron ores ....................................90,0§§ utln tons
<br />Oopppor Oros ..............................~....l0,GW~utle tova'
<br />Lund m•oe ...... ............................... §,285. rm tons
<br />'Lloa ores .....................................6§,U:L,izaa tone
<br />Iu addition to the above, there lms been sl»pped frotn..the prop-
<br />erty ry,g63.111o tons of mill tailings, and 3,g8q.ad0 toes of crude ore
<br />by the lessees, nmkivg n total production of ra[,y661o36 tons for the
<br />year.
<br />
<br />v
<br />4Y,
<br />
|