Laserfiche WebLink
y <br />feet of drifts and levels and 250 feet of winzee and raises. <br />The ore after reaching the surface ie trammed by hand <br />to the ore bins from which it Se drawn and crushed to nut <br />size in a Hlake Crusher and passes into a bin at the head of <br />an aerial jig back tram and thence to .the mill. <br />UNDERGROUND~RUIPMENT. 'i. <br />The mine Se equipped with Electric Lights, air lines, <br />Icater lines, air drills, good chutes, care and treck. The <br />Ihoieting cable ie a 1 inch practically new steel cable and <br />! <br />!is fitted. with a safety hook, which is annealed every :.-.. <br />jtwo weeks. Candles and carbide lamps are used in addition <br />to the electric lights. Men are net allowed to ride ,on the <br />care. <br />MINE SURFACE EQUIPMENT. <br />Shaft house, engine room, blacksmith shop, boiler roan <br />'office, ore house, powder house, tramway and water works. <br />i "It I ~ <br />, <br />I The hoist in the engine room ie 12x16 Duplex Geared <br />i ~ <br /> <br />hoist with 4 f oot drum and is equipped with positive indicator. ~:, i , <br /> <br />f <br />~ <br />I,The blacksmith shop ie furnished with ail modern hand tools <br />~" ~ <br />) }! <br />+ x. <br />~ <br />~ <br />hand compressed air forge oonnectione, all oompreased air ~ <br />i . <br />19~ <br />used around the mines being derived from the air aomproesors 'I <br />~~~ <br />i ~ <br />~~ <br />~~ ~ <br /> <br />let the mill. The boiler for hoisting engine ie a 40 H.P. Il ~ _ <br />I <br />tubes) <br /> <br />(size 4 1/2 Peatx 12 tent, ~D three.1'noYi„ <br />', tubular boiler <br />~ <br />i <br />! , <br />r <br />S i ; j <br />, <br />t II <br />~ ~ <br />~ <br />' <br />er. <br />(carrying sixty, pounds pressure and using spring wa tl <br /> <br />! '~i <br />i <br />. <br />t~. <br />~ <br />~ <br />I <br />The offioe ie in the euparintendonte reeidenoe about two ~ <br />' I <br />4, .~I <br />I; <br />''hundred feet distanoe from the shaft house. I' <br />I i ~~ ~ ~:. <br />t. ~ !' <br />The ore house has three 600 ton oro bins and one ~ a, <br />i <br />'100 ton bin, xhioh are.kept filled eo that if anything should i I j <br />~ ~ <br />the mill would have several <br />doley profluotion from the mine ~ ~, <br />! <br />days supply to deaw upon. Tho arushor and the elevator, ~ ,~;! ~ ; <br />~ ~ <br /> <br />whioh elevates the crushed materiel into the bin at the head <br />~ ! <br />~ <br />t' i ~; <br />oro drivetl by s 6 H.P. bloat. Motor, the eleatriolty <br />of the tram ~, i~ <br />, <br />o stem being generated <br />ifor both this motor and ,the lighting Y .i <br />i ~~ <br />~ j' <br />l <br />fat the mill by water psror• ,, <br />The powfler stands about 160 feet from the othor ~ ~ l' <br /> <br />!builflings and is trams, covered with sheet iron. About ,V <br />~ <br /> <br />~i1500$ of powfler is_ueually kopt in atorapo. it <br />i <br />~, The rater sor all purposes is obtainod from a water <br />I <br />i <br /> <br />