Laserfiche WebLink
<br /> STATISTICS. <br />DEVP,lAPIofLPI1':.. <br />Total No.of <br />Total ido.of <br />Total Plo.of <br />Total P7o.of <br /> <br /> <br />Total t~7o.of ft,in shafts <br />ft.in drifts <br />ft,in cross-cu <br />ft,in raises <br /> <br /> <br />ft.development Opp Coet per ft. <br />1136 Cost per ft. <br />ts 10 Cost per ft, <br /> <br />900 Coat per ft, <br /> <br />g44J 25.00 <br />$10,00 <br />$10.00 <br /> <br />a <br />~+ 10.00 <br />lr91~! t~1PL0YL1):- <br />15 miners ~ h.2.7; per day of 9 hours. <br />2 timbermen C~ X3,50 per day of 9 hours. <br />2 trasmers plc y2,50 per day of 9 hours, <br />1 top man @ yg,00 per day of 9 hours. <br />T. engineers @ X3,50 per day of 12 hours. <br />1 blacksmitl: C~ ~3.50'per day of 9 hours, <br />i superintendent. <br />COSTS:- <br />Coal ,x,,75 per ton. <br />Timber lOcts.per inch <br />Lumber $24.00 per,M. <br />Steel 10 etc.per pound <br />`' "Oil ~0rC~7attar gal]on • <br />' Powder ;10.14 per pound <br />Average per month $100,00 <br />Averagercost por month $75.00• <br />Average cost per aonth x"5,00 <br />Average coat pex• month y,5.00 <br />Average cost per month E50.00 <br />1 `€~ <br />yy <br />4- <br />t] <br />a.. <br />i <br />.~ <br />