My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00627
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2009 2:43:39 PM
Creation date
11/18/2007 12:12:49 PM
Metadata
Fields
Template:
Mine Books
County
Gilpin
Volume
6
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
^ <br />MINING qND MINE MEiHpDS. <br />The main opening ie a two compartment (bucket and ladder way)shaft 5X9. <br />ft.400 ft.i~ep, <br />The shaft ka vertical for the first 300 ft.~thence dips to the south <br />at an angle of 75°, <br />The shaft has the following levels running therefrom:- <br />100 ft.level running 300 ft,east and 100 ft,west; <br />200 ft.level running 200 ft.east and 150 ft,weat; <br />300 ft.level running 200 ft,east and 150 Ft.west; <br />400 ft.lavel running 20 ft.east and 15 ft.west, <br />There are two raises from 100 ft.level to surfacep4 raises from the 200 <br />ft, level to the l0U ft.levelgand 3 raises from the 30U ft.level to tho <br />200 ft.'_evel. <br />Mork is being carried on at present in the 300 east breast cross-cut to <br />north GO ft.east of shaft on 300 ft,'_eval~cross-cut to north 10 1't.wes+, <br />cf s,:nft on the <br />400 level. <br />Titc nearest workings are those of the Lotus crosscut 800 Pt.to the west, <br />The hoisting is done by bucket attached to 7~8° steel cable in good con- <br />dition,by safety c~^aiZ wttd clip fastening. 17eight of load hoisted 17001; <br />i$e bell line consists of a 3~8s hemp rooe attached to a Gs gong. <br />The Colorado code of signals is employed . <br />Tits method of mining is that of overhand stoping using single hand drills, <br />The atu11 method of timbering is employed using red spruce and pine. <br />The tramming is done by trammers using trolley and bucket(1000!.t bucket <br />and $" trolley), <br />Trackage consists of 8# rails and lg" guage, <br />The drainage is effected by a 200 gallon water barrellhoisting abou{ <br />1S000 gallons in 24 hours, <br />The natural system of ventilation is employed. <br />Sanitary conditions-good. <br />There is ne exit other than the working shaft which is provided with a <br />good ladder road with stations ovary 20 feet. <br />Caadlea are used for lighting undei'greund. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.