Laserfiche WebLink
_. <br />8TATISTICS. ' <br />Average tonnap,•e per month,. 900. <br />Total feet in siisfta, 1,400. Cast per foot, ;20,00. <br />Total feet in drifts or levels, 9y760, Coet per foot X9.00. <br />Total feet in cross cuts, 1,96:'i. Cost ;ior foot, X9.00. <br />Total feet in'crinzes and raises, 925,. Coat pox foot ~E3.00:, <br />Total feet in devslopmarrt, 14,050. <br />Fdarr employed. ~ ~ ~' ~" • <br />14 .machine drillmen, ,: ;j4:00 fvr 8 hour shift. <br />l machine helper, ;3.50 "; B " n <br />5 miners, 5.00 " 8 " " <br />2 timbermen, 3..50 " 8 " " ' <br />2 helpers, 3.00 ° 8 " " <br />9 tramme ra, 3.00 „ g n n <br />10 ore sorters, '3.00 " 8 " " <br />2 top men, ' 3.00 " g ~~ ~~ <br />1 laborer, 3.00 ° 8 ° " <br />2 en~ineera, 4.50 „ 8 „ „ <br />1 fireman, 3.50 " S " " <br />2 blacksmith's, 4.00 " 8 ° " <br />2 helpers, 3.50 ° 8 " " <br />1 foreman, 4.50 " 8 " " <br />1 office help, 3.75 " S " " <br />2 carpenters, 4.00 n g n n <br />1 machinist, 4.00 " S " ~~ <br />1 Supt., 5x250.00 per month. <br />Average cumber oi' men employed for the year, f>0. <br />34 underground and 25 on surface. <br />Cost. <br />Oost of fuel per ton, ~j6.50. Average cost per month, ,rG00.00. <br />Cost of timber, ~r22.00 per TT. Average cost per month,7,00.00. <br />Cost of steal, 8~ per lb..Avera,'ce cost per month, d~50.00. <br />Cost of oil, 31. per gal. Avsrap;a coat nor month, ~~u5.00. <br />Coat of powder, 11.70 per cwt. Average cost pox month, 600.00. <br />Snppliea are delivered to mine. <br />Avarat;•e assay valuo ore per ton, p55.00. <br />Coat per ton, minim; oro $s1G.00.,~ <br />Cost per trausportatiorr and treatment, ~j6.75. <br />