_.
<br />8TATISTICS. '
<br />Average tonnap,•e per month,. 900.
<br />Total feet in siisfta, 1,400. Cast per foot, ;20,00.
<br />Total feet in drifts or levels, 9y760, Coet per foot X9.00.
<br />Total feet in cross cuts, 1,96:'i. Cost ;ior foot, X9.00.
<br />Total feet in'crinzes and raises, 925,. Coat pox foot ~E3.00:,
<br />Total feet in devslopmarrt, 14,050.
<br />Fdarr employed. ~ ~ ~' ~" •
<br />14 .machine drillmen, ,: ;j4:00 fvr 8 hour shift.
<br />l machine helper, ;3.50 "; B " n
<br />5 miners, 5.00 " 8 " "
<br />2 timbermen, 3..50 " 8 " " '
<br />2 helpers, 3.00 ° 8 " "
<br />9 tramme ra, 3.00 „ g n n
<br />10 ore sorters, '3.00 " 8 " "
<br />2 top men, ' 3.00 " g ~~ ~~
<br />1 laborer, 3.00 ° 8 ° "
<br />2 en~ineera, 4.50 „ 8 „ „
<br />1 fireman, 3.50 " S " "
<br />2 blacksmith's, 4.00 " 8 ° "
<br />2 helpers, 3.50 ° 8 " "
<br />1 foreman, 4.50 " 8 " "
<br />1 office help, 3.75 " S " "
<br />2 carpenters, 4.00 n g n n
<br />1 machinist, 4.00 " S " ~~
<br />1 Supt., 5x250.00 per month.
<br />Average cumber oi' men employed for the year, f>0.
<br />34 underground and 25 on surface.
<br />Cost.
<br />Oost of fuel per ton, ~j6.50. Average cost per month, ,rG00.00.
<br />Cost of timber, ~r22.00 per TT. Average cost per month,7,00.00.
<br />Cost of steal, 8~ per lb..Avera,'ce cost per month, d~50.00.
<br />Cost of oil, 31. per gal. Avsrap;a coat nor month, ~~u5.00.
<br />Coat of powder, 11.70 per cwt. Average cost pox month, 600.00.
<br />Snppliea are delivered to mine.
<br />Avarat;•e assay valuo ore per ton, p55.00.
<br />Coat per ton, minim; oro $s1G.00.,~
<br />Cost per trausportatiorr and treatment, ~j6.75.
<br />
|