Laserfiche WebLink
ES I N I N• 0 (Continued), <br />~~. <br />The man way is provided with ladders~.k}cs-lade , <br />effd=tee, The ladder-vray does not contain eteam,water or air <br />pipes or boxes. The landings are not provided in ladder-nay. <br />There are no winzes or man ways connecting levels. <br />The property is connected c„;t}c .{owing Star mine. Exit is reaclil.,y <br />accessible to employees. Lighting under ground by candles. <br />S T A T I S T I C S. <br /> ~ Production, <br /> I Average tonnage per month 600 tons. <br /> Development, <br /> Total number ft in shaft 560 ft <br /> Total number ft in drifts or levels 2,000 ft <br /> Total number ft in cross-cuts 400 ft <br /> Total number ft in vrinzes and raised 200 ft <br /> Total number of ft in development 3,160 ft <br /> ;den employed, <br /> 3 Miners at $3.00 per day of 8 hours <br /> 1 Trammer " $3.00 " <br /> 1 Engineer " $4.00 " <br /> i r'iOet ~ <br /> Cost of fuel $5.25 per ton <br /> Average coot fuel per month $45.00 <br /> Aver:~,ge cost timber per month $25.00 <br /> Average cost steel per month $ 5.00 <br /> Average cost oil per month $ 1.25 <br /> Average cost powder per month $15,00 <br /> Average assay value ore por ton $ x•27 <br /> Cost per ton mining of ore $ 1.50 <br />There are no transportation or treatment charges on the ore. <br />+, <br />._. <br />~, I 1 <br />~i ~ ' <br />,: <br />.i~ , <br />." I- <br />,`, l`1-' <br />~;~ <br />~I~~.. <br /> <br />