|
I8
<br />STATISTICS,
<br /> DEVELOPMENT.
<br />~p Total No. ft. in shafts 8099 Coet
<br />per ft,
<br />36,00
<br /> ,, ,, edits, 3000, 15.00
<br />olinea
<br />„ drifts or leve1s,107576,
<br />„ „
<br />7,22
<br /> „ winzea & raises 11b71, 10.00
<br />ver-
<br />„ development,
<br />130246,
<br /> MEN EMPIOYED.
<br />eep, g5 machine drillmen, X4.00 per day for g 'hour shift.
<br />
<br />at 4 hel era
<br />P 3.50
<br />„
<br />,.
<br />8
<br />,.
<br /> 13 miners 3.00 8 „
<br /> 26 timbermen, 3.b0 8 „
<br /> 26 helpers 3.00 8
<br /> 65 trammers, 3.00 „ 8
<br />
<br />unk
<br />83 ore assorters 3.00
<br />8 „
<br />„
<br /> 18 topmen, $3.00, 3.60 8
<br />
<br />7 laborers 3.00 „
<br />8 „ „
<br />
<br />9 engineers, X4.00, 4.50
<br />8 „
<br />„
<br />h 10 firemen, 3.50 8
<br />
<br />18 blacksmiths, 4.00
<br />8 „
<br /> 2 teamsters, 3.00 „ 8 „
<br />n• 10 foremen, y~5.U0, 7.00 8 „
<br /> 1 superintendent, 400.00
<br /> 3 office help X3,00, 7.00 „ g „ „
<br /> 136 millmen
<br />rtical, 4 nippers 3.00 B „
<br /> Average number of men employed for the year, 485.
<br />COSTS,
<br />level.
<br />Cost of fuel per ton, X4,50, Av. ooat per month, $3,915,00
<br />„ timber, % 20,00, „ „ 7,752,00
<br />e Colo- Note. During the month of July,
<br />300000 ft. soured lumber was usod,
<br />same.
<br />85 ft, Gross tonnage, 380,000 tons.
<br />30 H.P. Av. tonnage per month, (July) 8,800 tons, 26-1~2 days.
<br />s, Av. assay value per ton, X30,
<br />Cost per ton transporting to mill or smelter, ~1 to Qh6.
<br />the
<br />Av, ooat treatment per ton, X8.45.
<br />~Av. oost mining per ton, 3.13
<br />on
<br />a
<br />eel
<br />
<br />
|