Laserfiche WebLink
I8 <br />STATISTICS, <br /> DEVELOPMENT. <br />~p Total No. ft. in shafts 8099 Coet <br />per ft, <br />36,00 <br /> ,, ,, edits, 3000, 15.00 <br />olinea <br />„ drifts or leve1s,107576, <br />„ „ <br />7,22 <br /> „ winzea & raises 11b71, 10.00 <br />ver- <br />„ development, <br />130246, <br /> MEN EMPIOYED. <br />eep, g5 machine drillmen, X4.00 per day for g 'hour shift. <br /> <br />at 4 hel era <br />P 3.50 <br />„ <br />,. <br />8 <br />,. <br /> 13 miners 3.00 8 „ <br /> 26 timbermen, 3.b0 8 „ <br /> 26 helpers 3.00 8 <br /> 65 trammers, 3.00 „ 8 <br /> <br />unk <br />83 ore assorters 3.00 <br />8 „ <br />„ <br /> 18 topmen, $3.00, 3.60 8 <br /> <br />7 laborers 3.00 „ <br />8 „ „ <br /> <br />9 engineers, X4.00, 4.50 <br />8 „ <br />„ <br />h 10 firemen, 3.50 8 <br /> <br />18 blacksmiths, 4.00 <br />8 „ <br /> 2 teamsters, 3.00 „ 8 „ <br />n• 10 foremen, y~5.U0, 7.00 8 „ <br /> 1 superintendent, 400.00 <br /> 3 office help X3,00, 7.00 „ g „ „ <br /> 136 millmen <br />rtical, 4 nippers 3.00 B „ <br /> Average number of men employed for the year, 485. <br />COSTS, <br />level. <br />Cost of fuel per ton, X4,50, Av. ooat per month, $3,915,00 <br />„ timber, % 20,00, „ „ 7,752,00 <br />e Colo- Note. During the month of July, <br />300000 ft. soured lumber was usod, <br />same. <br />85 ft, Gross tonnage, 380,000 tons. <br />30 H.P. Av. tonnage per month, (July) 8,800 tons, 26-1~2 days. <br />s, Av. assay value per ton, X30, <br />Cost per ton transporting to mill or smelter, ~1 to Qh6. <br />the <br />Av, ooat treatment per ton, X8.45. <br />~Av. oost mining per ton, 3.13 <br />on <br />a <br />eel <br /> <br />