Laserfiche WebLink
is <br />SIIRFACE PLANT- Continued, <br />A large commodious office for purchasing agent, book- <br />keeper, manager, superintendent and engineer is located about 75 ft. <br />east of shaft house. <br />To the east of office, and on the same level, are the <br />store house, lodge, mess and assay office, <br />No,2 SHAFT. <br />Shaft house 44 x 121 ft, frame, containing gallows frame, 8 post type, <br />14 x 14, 60 ft, high, with 6 ft. iron sheave wheels. <br />One 17ebster, Camp & Lane, first motion hoist, double <br />cylinder 20 x 48, double spool, carrying 5" flat rope. Brakes operated <br />by compressed air. Capacity unbalanced, load of 8000 lbs. 1500 ft. <br />per minute. Provided with positive indicator. <br />One double 8 x 10 1d. & S. friction clutch, 25 H. P, <br />hoist, used for operating "dinky" cage, occupying east compartment of <br />I <br />~; shaft, Hoist carries 3~4" steel cable in good condition. <br />~I One 30 H, P, motor, operating belt and link conveyors, <br />f <br />and rope hauling machinery, Shaft house has a wing to the east, 45 x 55 <br />~' ft, for boiler house, containing exve~ws. two Cahill and one Heine, <br />300 H. P, water tube boilers, connected with a self-sustaining stack, ' <br />66 in, in diameter, and 110 ft, high; coal bins, steel construction, <br />capacity, 40U tons, same being provided with e double 8 x l0 in, F,13, <br />flat friction hoist, for hauling side dump coal cars, 72 cubic ft, <br />capacity, from railroad siding to coel bin; two Cameron boiler Peed <br />pumps with hose connections for fire, <br />A wing to the west of shaft house, is in the course <br />of construction, and contains a new, b0 drill, ingeraoll, Sergeant <br />Compound Air Compressor, which will be started up in a Pew days. <br />Ore house, 4b x 90 ft. S, E, of shaft house, oontain- <br />ing bins, tables and washing machinery for the sorting and washing <br />of .the ore. <br />Po,3 SHAFT, <br />Head frame two poet type, 8 x 8", 2b ft, high, with 5 ft, iron sheave, <br />Engine house frame, 16 x 18 ft, located about 7b ft, <br />south of shaft, containing double 8 x 10 geared 1,1,&.S, Hoisting engine, <br />provided with positive indicator, (foundation of engine consists of <br />10 x 12, set on 8 x 8 poets in shaky condition), <br />