Laserfiche WebLink
r~~~ <br />employed; timbering by stulis and lagging, mith native <br />spruce and pine. Underground tramming by buokets and <br />trueke; tre.ekage 500 ft. T.-Rail. Ventilation natural; <br />shaft is divided into two compartments and is Provided <br />with ladderways which are safe, aeoure and aoceaeible, <br />vrith stations 16 or 20 ft, anPSt; there are r3ome winzes <br />and manways oonneoting levels. Mine has but one exit <br />for employees. <br />S T A T L S T I C S. <br />Gross production ~ 900 tons. <br />Average tonnage per month would not asoertain. <br />Total number of eet in shaft 300 <br />Cost per foot $25. <br />Total number of i'uut in urifts and l evels 400 <br />Cost $8, per foot <br />Total number of feet in cross outs 500 <br />Coat per foot $S. <br />Total number of feet in minzes and r aises 200 <br />Cost per foot ~k7. <br />Total number of feet in development 1400 <br />LABOR: <br />1 rnaohine drill raan 8 hours v $4.00 <br />1 ]Hiner " 4.00 <br />1 tramr.er " 3.00 <br />Average number of Men employed for the year 3. <br />Coat oi' iliel,$6.b0 pei• ton <br />Average oost Per month $ 20.00 <br />Coat of timhera, average Per month 10.00 <br />Cost of steel averago Per wunth 2.00 <br />Average cost of oil per nvnth 1.20 <br />Cost of powdNr 13 ats lb, average Her r:.onth 26.00 <br />Average assay value oY ors ])zr ton ~15.OG <br />Coat Per ton for transportation and treatment of same $5.65 <br />