My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00317
>
Day Forward
>
Mine Books
>
MINEBK00317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2009 9:08:21 AM
Creation date
11/18/2007 12:02:49 PM
Metadata
Fields
Template:
Mine Books
County
Lake
Volume
10
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Td I N I N G (Continued). <br />The shaft is divided into two compartments bucket and ladderacays. <br />The shaft is provided with ladders,the ladders are safe,securo and <br />accessible. The ladderway does not contain staem~vater or air pipes <br />or boxes. Landings are provided in laddervay not to exceed 20 ft <br />apart. There are winzes and manways connactinp, levels,at bast one <br />is kept in repair and equipped with ladders. <br />The mine is connected with Ibex and Big Four properties. Pxits are <br />readily accessible to employees. <br />Lighting underground electric and candles. <br />S T A T I S T I C S. <br />Production, <br />Average tonnage per month 200 tons <br />i' <br /> <br />Development, ,, <br />~,~ <br />Total number of ft in shaft G00 ft ~ ~ <br />~~ <br />Total number of ft is drifts or levels 1000 ft I,j <br />~ <br />Total number of ft in tivinae 41 ft <br />~I <br />~! <br />Total number of ft in development work 1,641 ft ~: <br />i <br /> <br />Tden employed, i <br /> <br />!+ P, 1 <br />14 givers at $3.00 to 3.50 for A hour shifts ~::~,: <br />3 Tranmers " $3.00 " ~~ ~ <br /> <br />" $3,50 <br />1 Topman <br />° ~~ <br />l <br />2 Enginoera " $4.00 " <br /> <br /> <br />1 Blacksmith " vq4•~ ", ~~ , <br /> <br />, . <br /> % <br />} <br /> c <br />Coat. f <br />Coat of fuel $S:OO,average cost per month $150.00 i <br /> <br />Average cost of timber per month e 50.00 ~ t', <br />r t <br />Average cost of steel per month <br />25.00 <br />$ <br />Average cost oY oil per month <br />$ 10.00 <br />i <br /> <br />er month <br />pveraY,e cost of powder p <br />$ 75.00 <br />Average assay value ore per ton <br />$ 12.00 <br /> <br />er ton mining ore <br />Average cost p <br />$ 1.35 <br /> $ ,75 <br />Coat per ton transporting ore <br /> $ 5.00 <br />Coat por ton treatment of ore <br />
The URL can be used to link to this page
Your browser does not support the video tag.