1~ •
<br />~; f id I N I J! G lContlnned).
<br />II ~ti; raised and lowered with hoisting machinery, ti"eight of load
<br />13' , .,? i lden are
<br />~1~i r
<br />hoisted 2,000 lba, Distance hoisted S00 Ft.
<br />~:.~il
<br />~ The cable is of steel wire 7~Ptha and in good condition Cannot give
<br />I' I; i ~ l
<br />'I
<br />..
<br />!;;;. length of time cable hea been inr use.
<br />rI s: Hook used~on end of cable chainhook,cannot give length of time in
<br />;1~
<br />~_
<br />i ~ . use,
<br />?'here are no safety devices used to prevent over-winding.
<br />is
<br />The material is hoisted from one level.
<br />The bell line consists of 1~2 inch hemp ropy and is new,
<br />~~ I not _
<br />.:jl ?'ha state code of signals iegposted in engineroom,at collar of
<br />F
<br />;SI shaft and at each level station.
<br />9
<br />'.~q All persons are prohibited from riding on loaded bucket, This or-
<br />', ii
<br />~' ~i der is not posted near collar of shaft.
<br />`'~'~+ Notice atati the maximum numbr cf men
<br />ng permitted to ride upon
<br />I
<br />;
<br />±.
<br />.~?, bucket at
<br />one timt Ie i.cc posted at collar of shaft and at each
<br /> ,
<br />„
<br />~ ~..
<br />,
<br />,;•~ level station.
<br />:+
<br />+'
<br />,
<br />il~,i°{
<br />i~ljl~!~
<br />a `,
<br />~ ,; ,
<br />Tha loading devioo em^ioyed ie dump car in bucket,eteel aMttq is
<br />'Ij~~s~''~i
<br />.~ employed.
<br />
<br />Y.. il .
<br />~,~~'
<br />~i~;
<br />~~i~ All level stations are provided with passageway around working
<br />.
<br />l,,~il
<br />I,y,lG
<br />
<br />shaft. The shaft is not at all stations provided with guardrails,
<br />~
<br />~'~~
<br />j ':!~~; i The shaft is secured b illar of
<br />y P ground on each aide •aufficient to
<br />;~ri~ ,
<br />~, .,
<br />;.w insure safety.
<br />~'~' I
<br />~
<br />' not
<br />I,I
<br />JyJ
<br />y All winzea or mill holes are covered or surrounded with guardrails,
<br />';
<br />11
<br />),
<br />ilil~ 1
<br />i
<br />~
<br />~`~~I ~
<br />The shaft is not being sunk.
<br />~
<br />y
<br />~
<br />f~! '.~~
<br />I
<br />Shafthouse over collar of shaft, Tfie method of ore extraction is
<br />
<br />[)„
<br />'
<br />'Ii'
<br />over-hand sto i
<br />p ng with hand drills both single and double,
<br />~~~~,~~~
<br />;~
<br />~ The timbering method employed ie that of square sets,cribs and
<br />~
<br />;~~~~~ stulla,mifficient,
<br />~i~ The timbers used era white spruce prepared at mill and in good con-
<br />"t' ditioa, The loading chutes employed of the ordinary 8- inch plank,
<br />~. ..
<br />Underground tramming by manual labor with 1-ton steel bucket,
<br />~' Track a 18 Ia
<br />ag guaga 12 lb rails,
<br />Ventillation natural sad aufficient. S±oxious eases are not mat with
<br />,i Sanitary conditions are good,all old timbers have been removed from
<br />underground workings wherever necessary,
<br />~ ,
<br />
|