Laserfiche WebLink
1~ • <br />~; f id I N I J! G lContlnned). <br />II ~ti; raised and lowered with hoisting machinery, ti"eight of load <br />13' , .,? i lden are <br />~1~i r <br />hoisted 2,000 lba, Distance hoisted S00 Ft. <br />~:.~il <br />~ The cable is of steel wire 7~Ptha and in good condition Cannot give <br />I' I; i ~ l <br />'I <br />.. <br />!;;;. length of time cable hea been inr use. <br />rI s: Hook used~on end of cable chainhook,cannot give length of time in <br />;1~ <br />~_ <br />i ~ . use, <br />?'here are no safety devices used to prevent over-winding. <br />is <br />The material is hoisted from one level. <br />The bell line consists of 1~2 inch hemp ropy and is new, <br />~~ I not _ <br />.:jl ?'ha state code of signals iegposted in engineroom,at collar of <br />F <br />;SI shaft and at each level station. <br />9 <br />'.~q All persons are prohibited from riding on loaded bucket, This or- <br />', ii <br />~' ~i der is not posted near collar of shaft. <br />`'~'~+ Notice atati the maximum numbr cf men <br />ng permitted to ride upon <br />I <br />; <br />±. <br />.~?, bucket at <br />one timt Ie i.cc posted at collar of shaft and at each <br /> , <br />„ <br />~ ~.. <br />, <br />,;•~ level station. <br />:+ <br />+' <br />, <br />il~,i°{ <br />i~ljl~!~ <br />a `, <br />~ ,; , <br />Tha loading devioo em^ioyed ie dump car in bucket,eteel aMttq is <br />'Ij~~s~''~i <br />.~ employed. <br /> <br />Y.. il . <br />~,~~' <br />~i~; <br />~~i~ All level stations are provided with passageway around working <br />. <br />l,,~il <br />I,y,lG <br /> <br />shaft. The shaft is not at all stations provided with guardrails, <br />~ <br />~'~~ <br />j ':!~~; i The shaft is secured b illar of <br />y P ground on each aide •aufficient to <br />;~ri~ , <br />~, ., <br />;.w insure safety. <br />~'~' I <br />~ <br />' not <br />I,I <br />JyJ <br />y All winzea or mill holes are covered or surrounded with guardrails, <br />'; <br />11 <br />), <br />ilil~ 1 <br />i <br />~ <br />~`~~I ~ <br />The shaft is not being sunk. <br />~ <br />y <br />~ <br />f~! '.~~ <br />I <br />Shafthouse over collar of shaft, Tfie method of ore extraction is <br /> <br />[)„ <br />' <br />'Ii' <br />over-hand sto i <br />p ng with hand drills both single and double, <br />~~~~,~~~ <br />;~ <br />~ The timbering method employed ie that of square sets,cribs and <br />~ <br />;~~~~~ stulla,mifficient, <br />~i~ The timbers used era white spruce prepared at mill and in good con- <br />"t' ditioa, The loading chutes employed of the ordinary 8- inch plank, <br />~. .. <br />Underground tramming by manual labor with 1-ton steel bucket, <br />~' Track a 18 Ia <br />ag guaga 12 lb rails, <br />Ventillation natural sad aufficient. S±oxious eases are not mat with <br />,i Sanitary conditions are good,all old timbers have been removed from <br />underground workings wherever necessary, <br />~ , <br />