My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MINEBK00283
DRMS
>
Day Forward
>
Mine Books
>
MINEBK00283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2009 9:17:53 AM
Creation date
11/18/2007 12:01:04 PM
Metadata
Fields
Template:
Mine Books
County
Saguache
Volume
7
Document
Inspectr
Suffix
A
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATISTICS. <br />1)evelopmerrt. <br />Total feet in shafts, 1,000. Cost per foot X15.00 <br />Totai feot do tunnels or adits, 3,000. Cost per foot 5y15.00. <br />Total feet in drifts or levels, 2,000. cost per foot, ;pg.00. <br />Total feat in wlTl'L0a or raises, 500. Cost per foot x"6.60. <br />Total number of feet in development 6,500. <br />PI[en employed, <br />2 machine drillmen, C~. X3.50 for g hour shirt. <br />2 machine helpers, 3.00 " g " " <br />1? miners, 3.00 " 8 " " <br />2 timbermen, 3.50 •~ 8 " " <br />4 trammers, 4.00 " g " " <br />1 ore sorter, 3.00 " 0 " " <br />4 topmen, 3.00 ° 5 " <br />1 assayer. <br />2 engineers, 3.50 " g " " <br />2 firemen, 3.50 " © " <br />2 blaclcami*,hs, 4.00 " 8 " " <br />1 foreman, 4.00 " g " " <br />l,Supt.,~yho ie,part ovrner of ti?e property. <br />Average,numl;er of man emplcyed for the year, 35. Six on sur- <br />face and 20 under ground. <br />Cost. <br />Cost, of fuel, i~10.00 per L•on. Avarap;e cost per mwzth, `300.00. <br />Cost of timber, X7.2.00 por Pd. Avorage cost per month, 100.00. <br />Cos t• oi' steel '3~ por lb. Average cost per month, ~"p1b:00. <br />Cost of o11, 45~ per gal. Avera~s cast per month, X5.00. <br />Cost of ponder, tp15.50 par c'+rt. Ave rags coat per month, ?y"400.00. <br />Cost oi' transporti?ur supplies to m1no, 35~! per cwt. Average cost <br />por month, 5r?00.00. <br />Averar;o assay value ore per ton, ~~25.00 to $35.00. <br />Coat per ton minim, of ure, 5x3.00 to {p5.00. <br />Cost por t'ou transporti?rg ore, X3.00 by vragon to P,. R. and 5p1..50 to <br />3.00 qn R.R. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.