Laserfiche WebLink
<br />Coat: <br />Coat of fuel ;6,OG pe; tun; average cost per month $7,,00 <br />Coat of timbers; average cost ner month <br />30,00 <br />Coat of steel, average der :-:oath • <br />10,00 <br />Cost o: oil, average ner u:onth <br />3.00 <br />Cost o£ powder 12-1~2 ets per lb; avera~~e ~nr rr+n+,,~ 1?5,00 <br />.^•~~rage assay value of ore $15.00 <br />Cost per ton for minim same $5,00 • <br />Cost of transporting and treatment n £ ores X5,00 <br />G E N E R A L R E M A R K S. <br />All shafts, pits and other excavaticr.r••er T.roperty Feevrely <br />ail aeoi2eats have uaen reported ~ the ]3ureau of Lines <br />fine flces nct ::arrY any insurance against accidents; <br />Z"ine is a repul2r i~r~3~a~er and is morkad continuously; <br />1i~121ag e::,ent is fa:ailiar *~ith the statute relating to the opera- <br />tion of r,,eta111Pcrous nine,;, <br />