Laserfiche WebLink
<br />(2) <br />Hoisting. <br />same ae reports:: of 1912-Ij. <br />1[ine methods <br />}iethod of ore •xtraotion-Stoping and drifting-No maohine drills <br />employed at present time-All .single hand drilling. <br />Timbering-Square eetts,snd drift setts(suffioient) <br />Underground tramming by men with ordinary mine oare,on I2 ib.t• <br />the yard rail-Dralnage,no pumping done, at present,water allowed <br />to raise in shaft t• Gth,lovel,pumps raised to avrfaoe. <br />ventilation-natural draft-No noxious gases met with, <br />Exits. <br />All~ahafta are divided into two Dompartmenta,with.ladder ways <br />safe and secure-Exits on eaoh level by oonneation with sthor <br />shafts. <br />Lighting underground:-EleotriDity and Dandles. <br />StatlatiDa. <br />Average tonnage per month:-rt50.-aros9 tonnago per year:-I 0.000. <br />De~~elopement:-Present management has ne record of de~~elopement. <br />Men amployed,(Company act.) <br />IO Miners. X3,00. per day. 6 hour shift. <br />:2 Engineers. X4.00. " " S " " <br />I Topman. =j,00. " n ~ n n <br />I Blaoksmith, ;1F.00. " " g " " <br />I Cager, X3.00. " " K " " <br />This property h8s reoently been leased in blooka of grounfl to e <br />number of leasing parties who work under DomPanY management,the <br />number of men working in the different'blooks will average GO <br />making the total number of men employed en the property:..-75. <br />Ooat. <br />Coat of timber ~20.per I00.-Average ooat per month:-#IG0.00. <br />" " Powder i5 ota.per ib. " " " " =500.00. <br />n"erage assay value of ore per ton:-t15,00.0ost per ton mining <br />ore:-X4.00.-Cost per ton transportation and treatment:-#G.25. <br />Oenersl remarks. <br />same ea reports •f IyI2-Ij. <br />