Laserfiche WebLink
---J <br />(2) <br />Relating. <br />Same 8a repolrta: oP 1912-Ij. <br />3[ine methods <br />Method of ore •xtraotion-3tsping and drifting-No maohins drills <br />employed at present time-Ali.aingie hand drilling. <br />Timbering-Square aetts,and drift aetta(auffioient) <br />Underground tramming by men with ordinary mine oara,en I2 lb.t• <br />the yard rail-Dralnaga,no pumping dene,at preaent,water ailewsd <br />to raise in shaft t• Gth,level,pumpa raised to surface. <br />Ventilation-natural draft-No noxious geese met with, <br />Exits. <br />All~shafta are divided into two oompartmenta,with.lndder wnya <br />safe and assure-Exits on each level by oonneotion with ether <br />shafts. <br />Lighting underground:-Electricity and candles. <br />statistics. <br />Average tonnage per month:-![50.-cFros9 tonrage per year:-I0.000. <br />Developenent:-Present management has no record of de~~elelement. <br /> 1[en employed,(Company act.) <br />IO Yinere. #3.00. per day, d hour shift. <br />;2 Engineers. #4.00. " " S + • <br />I TOpIDan. =j.00. » r ~ ~ r r <br />I Blacksmith. #1F.00, r r ~ r • <br />I Oager. tj,00, r' r ~ . <br />This property has recently been leaned in blocks •f ground to a <br />number of leasing par*.1da who work under company management,the <br />number of men working in the different"blocks will arerags GO <br />making the total number of men employed sti the property:-?5. <br />Coat. <br />Cost of timber ~20.per I00.-Average coat per month:-#IG0.00. <br />r powder 15 cta.per ib, • • • • X500.00. <br />Average assay value s! ore per ton:-~I5.OO.Coet per ton mining <br />ore:-~~,Op._Cest per ten tranapertation-and treatsnt:-#x.25. <br />General remarks. <br />same as reports of iyi2-Ij. <br /> <br />