Laserfiche WebLink
STATISTICS. <br />9 <br />The average tonnage per month is 300 tons. ', <br />Total Ito. Ft, in Shafts, 1500, Cost per ft. anO.00 <br />" " " "Drifts ar levels, 4000, Cost per ft,$A,0O <br />Total ~o. £oet in development is 5500. <br />>;abor. <br />ITo. employed. <br />5 I:achiao Lrillmen, w4.00 for f3 hour shift. <br />4 Trammers, w3,00 " " <br />1 Topman, j3.00 " " " " <br />1 engineer, 84.00 " " " „ <br />1 Superintandent, $300..00 per month. <br />The average number of men employed for the your is 12- <br />Rine undorground and three on the surface. <br />'Cost. <br />I <br />~Coel per ton-$6.25, averago <br />cost <br />per month, <br />X150.00 <br />~ Timber, per J.1. v3C . " <br />i " " " 100 .00 <br />!Steel 8-1~2 cont~ per lb. " " 5.00 <br />Oil Ld conto pox gal. " " 10.00 , <br />i <br />;Powder ?1,25 nor eza. <br />" <br />" " I <br />20O.CO <br />The s•verago a: say vrlua of tho or e per ton is x40.00 <br />'The cost per ton for mining is .^;,5 .00. j9 ,CO including <br />treatment. <br />