Laserfiche WebLink
-STATISTICS.' ~ (J <br />The average tonnage per ronth is 100 tons. <br />Development. <br />Total No. ft. in shaYts is 2100, Cost per ft.~20.00 <br />" " " "drifts or levels 1200, " 6.00 <br />i <br />" " " " 57i.nZ 8a Or raises, ~C, " " " 6.00 ' <br />Total lio. feet in development is 3700. <br />Labor. <br />No. employed . <br />4 Lachine llrillmen, $4.00 Yor 4 hour shift. <br />2 TiIDbermen, y3 .50 " " " " <br />2 Trarmers, ~3.,~A " " " " <br />2 Ore Assorters, $3.00 " " " <br />1 Engineer, $4.00 " " <br />1 Supterintendent, ;r5.C0 , " " " " <br />The overage number oY men employed Yor the year is 12, i <br />8 underground and 4 on the surYace. <br />i <br />Cost. i, <br />Fuel $4.75 per ton, e,vo. cost por Lio. $60 .CO ' <br />Timber, X35.00 PeT ~• " " " ~ 25.00 <br />Steol, 9 oents per lb. " " 5.r0 <br />011, 60 cents per gal. " " 5.00 <br />Powder, $13.25 per cwt. " " " 75.00 <br />The average essay value oY the ore is $50.00 per ton. <br />• i. <br />The poet per ton for mining the ore is 1,12.00 <br />i'~ <br />Coat por ton for transporting ore is 60 cents by eragon. j! <br />Coat of treatment and Yreight is $10.C0 <br />i <br />,. <br />